Laserfiche WebLink
*REC' <br />SWRCB, January 2002 age a4u <br />Secondary Containment Testing Report Form JUL 2.$ 2011 <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, written2W111:�10 <br />printoutsfrom tests (if applicable), should be provided to the facility owner/operator for submittal to thepcy <br />1 _ FACILITY INFORMATION <br />Facility Name: SMK Collier Road Chevron Date of Testing: June 9, 2011 <br />Facility Address: 25651 North Highway 99, Acampo, Ca. 95220 <br />Facility Contact: Tony Singh I Phone: (209) 333-1740 <br />Date Local Agency Was Notified of Testing: 6/2/11 by Afford -A -Test <br />Name of Local Agency Inspector (if present during testing): <br />TF.CTYNG CONTRACTOR INFORMATION <br />3. SUMMARY <br />OF TEST <br />RENULTN <br />Component <br />Pass <br />Fail <br />Not Repairs <br />Tested Made <br />Component Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Annular Tank #1 <br />X <br />❑ <br />❑ ❑ <br />Dispenser Sump #7&8 X <br />❑ <br />❑ <br />❑ <br />Annular Tank #2 <br />X <br />❑ <br />❑ ❑ <br />Dispenser Sump #9&10 X <br />❑ <br />❑ <br />❑ <br />Annular Tank #3 <br />X <br />❑ <br />❑ ❑ <br />Dispenser Sump #11&12 X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #1 <br />X <br />❑ <br />❑ ❑ <br />Fill Riser Sump #1 X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #2 <br />X <br />❑ <br />❑ ❑ <br />Fill Riser Sump #2 X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #3 <br />X <br />❑ <br />❑ ❑ <br />Fill Riser Sump #3 X <br />❑ <br />❑ <br />❑ <br />Piping Sump #1 <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #2 <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #3 <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #1&2 <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump#3&4 <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump#5&6 <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />I❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied and recovered for reuse by, R&D Compliance Testing. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature:Date: June 9, 2011 <br />