Laserfiche WebLink
f _ - <br /> 0 0 <br /> WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FACILITY NAME J DATE <br /> FACILITY ADDRESy x N n k t t (fit <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS �0INN n u u-ti �11� S�,��: 1 vo e ki,a-)PIPING �'®-,�} u � <br /> 3.Describe the location(s)of where the monitoring will be performed. ie:location of sensors <br /> n r�„�►t .'�� (�l,,� j\_ijat( S a* c_6, ' ( <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel ref °1L <br /> Name and Model of Line Leak Detectors / <br /> Name and Model of Annular Sensors �1�t o�� tC L <br /> Name and Model of Piping Sensors <br /> Name and Model of Dispenser Sensors 1 <br /> Type of overfill prevention 0 32 G QSW `� Li G L2 <br /> 5.Do the Turbine Sensors but down the turbine? Yes Ta No <br /> Does the turbine shut down if a sensor is disconnected? Yes 0 No, <br /> Does the turbine shut down is the monitoring panel loses power? Yes 0 No <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? s m n S c <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment. O . r 1 t-7 n'e. s <br /> �f 1 th 1_nv rJn k newt C ,�.nr;arc fvc.-caw.e 1% 1A <br /> I:\mstemi4e\UST\nionitoringplan.doc <br /> 1/24/2002 <br />