Laserfiche WebLink
SWRCB,January 2002 0 Page of <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: I�i'Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run <br /> Piping Run# Piping Run# Piping Run 4 <br /> ........... <br /> Piping Material: <br /> Piping Manufacturer: <br /> - <br /> Piping Diameter: <br /> Length of Piping Run: 7-6) <br /> Product Stored: D W� <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): L 2,5 <br /> Test End Time: 030 <br /> Final Reading(RF): '5-L_,g5 <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: 4asi::� b Fa 0 Pas DFal O Pass ❑0Fail 1, � O Pan-0 <br /> FAi ::;'*,.,. <br /> Comments— (include in formation repairs made prior to testing, and recommended follow-up for failed tests) <br />