Laserfiche WebLink
11/02/2005 11:12 I 7007775870 NO.41.4 907 <br /> SAN JOAQUMOUNTY ENVM3NMFNTAL 12"ALT$DEPARTIV N; <br /> UNDERGROM STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> ' TYPE Or ACTION ® 1.1.T W PLAN 2.CHANOF OF INFORMATION01 alar <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL UST®AT TIVS FACILITY. Mo±. <br /> (Check one item only)❑ 7I.11S PLAN MIMS ONLY THF.F0T.T.W81NG UST SYSTEN-I(S): <br /> I, PActLI.TY INFORMATION <br /> FACILITY ID at(.Agency We Only) <br /> FACILITY NAA& h1d3. <br /> FACILITY SITE ADDRESS 1 � <,� aloe. <br /> C[TY ec ct alto. <br /> II. EQUIPMENT TESTTNiG AI0.F EVENTM MAINTENANCE <br /> State law requires that tes(ing,preventive maintendttco,and calibration of moniloring equipment(c.g, sengors,probes,Linc Irak dcteatotr,,,etc.)be pe'formed in \106. <br /> accordance with the equipment manttfaorarera'instructions,or aruwal) ,whichever is nforc ftnquent, Such work must bo performed by qualiried pcasomiol. <br /> MONITORING FQUIPN'IENIT IS SERVICED 1.ANNUALLY ❑ 99.OTHER.(Specify): <br /> YXM: IU]vITORINr,>r LOCATIONS' <br /> This monitoring plan most include a Site Plan ahowing Ate genera(teal;and piping layouts and the locations where moniloring is pc&maed(i.e.,location of each 6era3oi, <br /> line leek detector,moni.toring system control panel,etc.j If you already have a diagram(e,g,McMol UST`fonitaring Site Plan from a Monitoring System Certillcatiod <br /> form,hazardous hlalcrials Business Plan map,etc,)which ahown all r uited information include it with this <br /> IV.. TANK MONITORING <br /> M ORING IS PLICrOPATD USING TI-Ir FOLL0IVING N4I T1IOD(S):(Check all that apply) alto <br /> I.CONTINUOUS EI,E(:TRONIC N IONI'CORING OF TANK ANNULr1R(IWMRST1TIAL)SPAC$(S)OR SECONDARY COA 1'AIN\IE\T vAUL'I(S) <br /> SECONDARY CONTAINMENT IS; ❑ a,DRY ❑ b.LIQUID FILLED ❑ c.U DER PRESS r,] d.UNDER VACIJl1M utt. <br /> PANF-1,MANurACTURER: F- Att2, MODEL 9: 5 0aria <br /> LE,%K SENSOR N1.�LNUFACTURER: IE Q N40DEL#(S): <br /> ❑ 2.AL1TO?,-fAnC TANK GAUGING(.ATCr)SYSTEM USED TO MONITOR SINGLE 1X LIVAL NK S <br /> PANT I.MANUFACTURER- atlt. MODEL.4; <br /> IN-TANTO PROBE NLRNUrACTURER; A118. MODEL P(S); <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DASLY,NIGHTLY ❑ c A'E XLY AIX <br /> ❑ d.NIONT JI.Y ❑ e,OTI-EM(Specify): <br /> PROGRAMivIED TESTS: ❑ a.0.1.g.p.h. ❑ b.0.2 g.p.h. ❑'c.OTHER(Specify): Att1. hcy. <br /> ❑ ?,INVENTORY Rl_CONCILIATION ❑ a,MANUAL PER 27 CCR P646 ❑ b.STATISTICAL PER 23 CCR§x646,1 a1s� <br /> ❑ y.NATEKLY MANUAL TANK GAUGING(yTTG)PER 23 CCR§26AS <br /> TT:STTNG PERIOD; ❑ a.36 HOURS ❑ b,60 HOVRS <br /> ❑ $,INTEGRITY TI_S'I7NG PER 211 CCR§2643.1 <br /> TT-.ST FREQUENCY; Q a.ANNUALLY ❑ b,ID18NNIALLY ❑ c,OTI-IER(Specify); hr_v, <br /> ❑ 6,VISUAL MONITORING DONT,; ❑ a.DAILY Q b.V4-MKLY(RagoirmapecyaNpn�ap <br /> ❑ 99.OTI•TER(Specify); lvt . <br /> V. PLL MONITORING <br /> MONITORING IS PERFOR11T-0 USING T.FII i FOJ.I.O WING N4E1,IJOD(S)(Chock all that apply) aa.w. <br /> 1.CONI7NUOUS ELECTRONIC NIONtTOPING OF PIPING SUMP(S)/TRENCF-1(FS)AND OTIMR SFCONDARyC0 TAIMht7 t*1 <br /> SECONDARY C0XTAINN4ENT IS: ❑ A.DRY ❑ b.LIQUID FILLED ❑ c.LM)ER PRESSURE ❑ d.UNDER VACUUM U31. <br /> PANEL NIANLITACTURE R; IL IMIJ MODEL#; St-:it c1 hili. <br /> LI'AK SCNSOR MANUFACTURER: NON. S <br /> h10>aEI.6(S); 1... <br /> WILL A PIPING LLAT:ALAZI TRIGGER AUfOMMIC PUMP(i.e.,TURW14L)SHLITD0117J? ❑ a. SIS b.NO <br /> WILL FAILURE./1)ISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTO\j,%nC PUN-ip Sl-IUTDOVJN? ❑ a,YES ® b.NO 1137. <br /> ❑ 2.MECOANtCAL LINE LEAK DETECTOR (MELD) THAT ROUTINELY PIWORNIS 3.0 g.p.h, LEAD: UST.S AND RESTRICTS OR SHUTS OFF <br /> PRODUCT'FLOW WHEN A LEAK IS DETECTED <br /> MELD N4AA1L7rACT1jRER(s): htls. MODEL#(S): M59 <br /> © 3,F1rCTRONIC LINE LEAK DFTEC1'OR(LLLD)THAT ROUTINELY PWORMS 3.0 g,p.h.I.E AK TESTS <br /> ZI.I.D MANUFACTURER; "'o. MODEL#: <br /> PROGRANd4\1TL?LINE INTEGRITY TESTS; ❑ a.N7INIMUM N40141P 1,Y 0.2 g.p.h. ❑ b.N/A\TI\M4 ANNUAL 0A g.p.h. AJaY <br /> WILL ELLD DETECTION OF A PIPING LEAD TRIGGER AUTOMATIC PUMP 3W- T00111*? ❑ a.YES ❑ b.NO 61QI <br /> WILL ELLD P:tILURJ-'DISCOVNECTION't'RIGGFR AU7'OM,ATIC P(JMP Sl4Uj DO11rN? ❑ a,YES ❑ b.NO hi4n. <br /> ❑ 4.1N1'EGRITYTF-STING <br /> TEST PRLQLIENCY: ❑ a,ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTbI)R(Specify) h1e3 AI46, <br /> ❑ 5.VJ$UAL MONITORING DONE: ❑ a.DAILY ❑ b,WEEKLY° Q c.\aN.MC'KTFILY,t&-'CIC TIh46 SYSTEMOPGRATFD— M67. <br /> I RagiarnAam.AyW,oaal —MowooFarmcw,46ngorwb,,Aodataarncygenemr*rAKjOpinganlyj&KsC4?SI&t,J(b)U) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUOTMENTS FOR FXEWT7ON FROM MONITORING PER 23 CCR P636(aX3) <br /> (� 7.NO PRODUCT 02 RZ-MOTE PILL PIPING IS CONNIXTED TO TI IG UST(e) <br /> ❑ <br /> 99.OTHER(Specify) <br /> SdCERD-d(07103)-114 07123103 <br />