My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2551
>
2300 - Underground Storage Tank Program
>
PR0231659
>
COMPLIANCE INFO_1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:37:54 PM
Creation date
6/23/2020 6:50:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0231659
PE
2361
FACILITY_ID
FA0003849
FACILITY_NAME
Verizon Business: MANTECA
STREET_NUMBER
2551
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19801005
CURRENT_STATUS
01
SITE_LOCATION
2551 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231659_2551 E LOUISE_1985-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FACILITY NAME W J C-7 DATE <br /> FACILITY ADDRESS S L— �.��:�� �'� M:,n�'c c u C A <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> 2.Describe the frequency of performing the monitoring for. <br /> TANKS n�;>1 u u 5 -If 1�t<S�;�:41 `M��;�s,�ypIPING C;®.�� ,n �A•��t) <br /> 3.Des6ribe the location(s)of where the monitoring will be performed ie:location of sensors <br /> ��, �c�,nit � � � _.,`i�o5� G,�nti'ar � Fac.L �-4niL vy{r�°:�1 '1^; �1., �{` Ser�S•�!' <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel F 1`,"W A�-A v s$ y- y <br /> Name and Model of Line Leak Detectors N /A <br /> Name and Model of Annular Sensors A mi o L <br /> Name and Model of Piping Sensors A&A�o Sk;K L S <br /> Name and Model of Dispenser Sensors N I A <br /> Type of overfill prevention --)o <br /> S.Do the Turbine Sensors but down the turbine? Yest No <br /> Does the turbine shut down if a sensor is disconnected? Yes❑ No <br /> Does the turbine shut down is the monitoring panel loses power? Yes❑ No f5 <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? s^;1N r� n Sv"ter, C-t!` �-, a} 4n <br /> —T'e' "^N \—)3, oLCt dr en OC.ky�,er .7� ny�M�it/ <br /> J <br /> Note.For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December31,2003. <br /> 8.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment. 0fV r& 'ria t*�h�•�a1 '.✓ �1cG�r�n;t_ t�cicni�loJ`:rS G®�;(,,r�tnfi �tn� <br /> avoir J(9 h �nv;r,7n�rtnikt C�,�,,�1i�nr � <br /> I:ktuterni-le\USTMnmitminsplan.doc <br /> 1/24/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.