Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FACILITY NAME W J C-7 DATE <br /> FACILITY ADDRESS S L— �.��:�� �'� M:,n�'c c u C A <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> 2.Describe the frequency of performing the monitoring for. <br /> TANKS n�;>1 u u 5 -If 1�t<S�;�:41 `M��;�s,�ypIPING C;®.�� ,n �A•��t) <br /> 3.Des6ribe the location(s)of where the monitoring will be performed ie:location of sensors <br /> ��, �c�,nit � � � _.,`i�o5� G,�nti'ar � Fac.L �-4niL vy{r�°:�1 '1^; �1., �{` Ser�S•�!' <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel F 1`,"W A�-A v s$ y- y <br /> Name and Model of Line Leak Detectors N /A <br /> Name and Model of Annular Sensors A mi o L <br /> Name and Model of Piping Sensors A&A�o Sk;K L S <br /> Name and Model of Dispenser Sensors N I A <br /> Type of overfill prevention --)o <br /> S.Do the Turbine Sensors but down the turbine? Yest No <br /> Does the turbine shut down if a sensor is disconnected? Yes❑ No <br /> Does the turbine shut down is the monitoring panel loses power? Yes❑ No f5 <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? s^;1N r� n Sv"ter, C-t!` �-, a} 4n <br /> —T'e' "^N \—)3, oLCt dr en OC.ky�,er .7� ny�M�it/ <br /> J <br /> Note.For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December31,2003. <br /> 8.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment. 0fV r& 'ria t*�h�•�a1 '.✓ �1cG�r�n;t_ t�cicni�loJ`:rS G®�;(,,r�tnfi �tn� <br /> avoir J(9 h �nv;r,7n�rtnikt C�,�,,�1i�nr � <br /> I:ktuterni-le\USTMnmitminsplan.doc <br /> 1/24/2002 <br />