My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2551
>
2300 - Underground Storage Tank Program
>
PR0231659
>
COMPLIANCE INFO_1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:37:54 PM
Creation date
6/23/2020 6:50:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0231659
PE
2361
FACILITY_ID
FA0003849
FACILITY_NAME
Verizon Business: MANTECA
STREET_NUMBER
2551
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19801005
CURRENT_STATUS
01
SITE_LOCATION
2551 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231659_2551 E LOUISE_1985-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/12/2003 11:10 9163712 _ BZSERVSTAMAINT PAGE 04 <br /> F. In-Tank Gauging/SI.Equipment: 6 Check this.box if tank gauging is used only for inventory control, <br /> O Cheek this box if no tank gauging or SIR equipment is installed. <br /> This soctiou must be completed if in-tank gauging equipment is used to perform leak detections monitoring. <br /> Com lute the folio checklis— <br /> _P <br /> Yes O No* Has all'inputwiring been inspected for pro#er entry and terminatic c4 including testing for ground faults? <br /> es Q No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> JX Yes O No* Was accuracy of system product level readl,498 tested? <br /> Yes O No* Was accuracy of system water level readier tested? <br /> Yes ❑ No* WOc all probes reinstalled property? <br /> Yes O No* Were all items on the equipment tmanufact 's maintenance checklist completed? <br /> *_In the Section K below'describe how and when these deflci cies were or wiMbe corrected. <br /> G. Line Leak Detectors(LLD): <Check this boat if LLDs are not installed. <br /> Com Iete the toch t; <br /> Q Yes O No* For equipment start-up Or annual equlpmeot cettif catiof, was a leak simulated to verify LLD'performance? <br /> O NIA (Check al!that apply) Simulated leak rate: 3 g.p.h_; M0.1 g.p.h; Q 0.2 g.p.h. <br /> O Yes O. No* Were all Ll_.Ds confirmed operational and a4cnmte within regulatory requirements?, <br /> ❑ Yes ❑ No* Was the testing apparatus properly eallbra ? <br /> Q Yes O No* For mechanical LLDs,does the LLV restrict.product flow if it detects a leak? <br /> Q NIA <br /> C3 Yes O No* Fos electronic LLDs,does the turbine automidcally shut off if the LLD detects a leak? <br /> O Yes ® No* For electronic LLDs,does the turbine autottisatically Haat off if.any portion of the monitoring system is disabled <br /> Cl NIA or disconnected? <br /> 0 Yes O No* For electronic L LD9,does the turbine autom*tically shut off if any portion of the monitoring system malfunctions <br /> O PIA or fails a test? <br /> 0 Yes O N0, Far electronic LLDs,have all aceossiblo wiri g connections been visually inspected? <br /> O NIA <br /> ®,Ye$ O No* Were all items on the equipment madufactut ws maintenance checklist completed? <br /> *in the Section H,below,describe how and when these detleleheles were or will be corrected. <br /> H. Comments: <br /> Page 3 Of 3 03MI <br />
The URL can be used to link to this page
Your browser does not support the video tag.