Laserfiche WebLink
e <br />111 STA 161 C A [E tj jj'-111 <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN fJ 2. CHANGE OF INFORMATION <br />490-1 <br />PLAN TYPE ❑ 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2 <br />(Check one item only) THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br />. <br />I. -FAC 6 INFORMATION - <br />FACILITY ID # (Agency Use Only) <br />BUSINESS NAME (Same as FACILITY NAME) <br />3. <br />BUSINESS SITE ADDRESS .e - . 103. <br />LtS?Gte <br />CITY <br />104. <br />-� P�TIJe o <br />IIEta P G EN CE _. <br />Testing, preventive maimenance, and calibration of monitoring equipment (e.g., sensors, probes, tine leak detectors, etc.) must be performed at the frequency <br />specified b the <br />pec y equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR §2632,2634,2638,2641 <br />MONITORING EQUIPMENT IS SERVICED 1. ANNUALLY ❑ 99. OTHER (�1�)' <br />490-3b <br />490-3S b <br />. MOP"01UNG LWATIONS <br />❑ 1. NEW SITE PLOT PLANMAP SUBMITTED WITH THIS PLAN. ❑ 2 PLOT PLANMAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)49o-4 <br />IV. TANKMOMT01MG IS PERFOWAMUSING TM FOLLOVANG OD( ) , <br />CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR RSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490.5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: �ra. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />490-6 <br />PANEL MANUFACTURER: 41. MODEL M M:5-2000 <br />490-8 <br />LEAK SENSOR MANUFACTURER: 490 -9 -MODEL #(S)!OD'© 490-10 <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MO OR SINGLE WALL TANK(SI. (23 CCR §2643) <br />490.11 <br />PANEL MANUFACTURER: 490.11 MODEL #: <br />490-13 <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): <br />490-15 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490.17 <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />490-18 <br />490-18 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490.20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />490-21 <br />490-22 <br />El 5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />490-24 <br />490-25 <br />❑ 99. OTHER (Specify): <br />490-26 <br />490-27 <br />V. P1PKM0Nff01MG IS PERFORMD USING TM FOUDWMG (S) (Check all that a ly) <br />El 1. CONTINUOUS MONITORING OF PIPE/PIPINGS (S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490.28 <br />UAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: . DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d UNDER VACUUM <br />49x29 <br />PANEL ACTURER490-30 MODEL #: /YrS ®J <br />490-31 <br />LEAK SENSOR MANUFACTURER: L-)qelA JA&.tL4C&490-32 MODEL #(S): L g> V> <br />490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-34 <br />FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />-MECHANICAL <br />490-35 <br />2. LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 gp h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR IMN <br />490-36 <br />MLLD MANUFACTURER(S): 490-37 MODEL #(S): <br />490.38 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 gph. LEAK TESTS (23 CCR §2636) <br />490.39 <br />ELLD MANUFACTURER(S) " MODEL #(S): <br />49041 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />490.42 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-43 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490.44 <br />4. PIPE INTEGRITY TESTING 49o-45 <br />TEST FREQUENCY a. ANNUALLY b. EVERY 3 YEARS c. OTHERS 1 490.4649047 <br />5. VISUAL PIPE MONITORING. <br />49048 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED• <br />49049 <br />* Allowed for rnomoog of unburiedmergency enera or fuel gipinS only HSC 25281. 3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR § aR3)1. <br />490.50 <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490-51 <br />❑ 99. OTHER (Specify) <br />490-52 <br />49(1 53 <br />111 STA 161 C A [E tj jj'-111 <br />