Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. ER DISPENSER CONTAINMENT MONITORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.540- <br />490-54b <br />❑ I. CONTINUOUS ELECTRONIC MONITORING ❑ 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />NO DISPENSERS ❑ 99. OTHER (Specify): T <br />PANEL MANUFACTURER: 490 -ss <br />MODEL #: 490-56. <br />LEAK SENSOR MANUFACTURER: 490'57 <br />MODEL #(S): 490-58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490-59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a. YES ❑ b. NO 490-60 <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO 490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a. YES ❑ b. NO 490-62 <br />2. UDC CONSTRUCTION IS ❑ 1. SINGLE -WALLED ❑ 2. DOUBLE -WALLED 490-63 <br />IF DOUBLE WALLED: 490-64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 1. LIQUID ❑ 2. PRESSURE 3. VACUUM _ <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490641 <br />V&PERIODICSYSTEMTESTING <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br />LEAK DETECTION (ELDI MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. (23 CCR $2644.1) <br />Z. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br />3. SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br />RECO EPING <br />The following monitoring/maintenance records are kept for this facility: <br />❑ Alarm logs 490-68a ❑ Visual Inspection Records 49a68b ❑ Tank integrity testing results 490-680 <br />❑ SIR testing results (and supporting documentation records). 490-6ed ❑ Tank gauging results (and supporting documentation records). 490-68e <br />❑ ATG Testing results (and supporting documentation records). 490-68f ❑ Corrosion Protection 60 -day logs 490.6s9 <br />❑ Equipment maintenance and calibration records. 490.68h <br />UL TRAINING <br />ersonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />MINIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 49"9b <br />OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490.69. <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.694 <br />CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e <br />STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490-69f <br />SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-699 <br />OTHER (Specify): M69h; M69i <br />Er This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />Operation of the UST systems in a manner consistent with the facility's best management practices <br />The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />A The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />A Names of contact person(s) for emergencies and monitoring alarms. 4H1 -7o <br />X COMIMZNTS(ADDITIONAL INFORMATION <br />Provide addA'tional comments here or indicate how' y pages with additi nal information on specific monitoring procedures are attached to this plan. 490-71 <br />H <br />el- i t I �f, �+ o• 9 ON" w I A wlrb t. UI$ u� 1 a NJ ✓`tc�^n e g (� ��n <br />XL PERSONNEL RESPONSIBILHIES <br />The UST Owner/Operator is responsible for ensuring that: t) the daily/routine UST monitoring activities and maintenance of UST Irak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following person( are responsible foe performing the monitoring and equipment maintenance:. - <br />NAME & ru 490-72 TITLE ot 490-73 <br />NAME 490.74 TITLE 490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />. q,.AMRQPERATOR SIGNAT <br />CERTIFICATION: I certify that the^ormation provi herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNAT 490.76 <br />DATE: 490-77 <br />`® <br />rE, <br />APPLICANT NAME (print): / / 490-78 <br />6ctn/ <br />APPLICANT TITLE: [ 49x79 <br />v YI <br />' ® Qi 7Oi <br />UPCF UST -D (12/2007) 3/4 <br />