Laserfiche WebLink
RECEIVED <br />SWRCB, January 2006 <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submitt - 41PALa 9 <br />1. FACILITY INFORMATION DEPARTMENT <br />2 TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 Ind Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ® David A. Winkler ❑ Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: <br />® Hydrostatic <br />❑ Vacuum <br />❑ Other <br />Test Equipment Used: TAPE MEASURE, H2O <br />x.,....... . _........,. <br />Equipment Resolution: <br />1/16" <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 <br />2 <br />3 <br />4 DIESEL <br />Bucket Installation Type: <br />❑ Direct Bury <br />❑Contained in Sump <br />El Direct Bury <br />❑Contained in Sump <br />El Direct Bury <br />❑ Contained in <br />Sump <br />®Direct Bury <br />E] Contained in <br />Sum <br />Bucket Diameter: <br />11 <br />Bucket Depth: <br />12 1/2 <br />Wait time between applying <br />vacuum/water and start of test: <br />_- <br />_ <br />_ <br />_ <br />Test Start Time (TI): <br />10 <br />Initial Reading (Ri): <br />12 <br />Test End Time (TF): <br />11 <br />Final Reading (RF): <br />12 <br />Test Duration (TF — T,): <br />HR <br />HR <br />HR <br />HR <br />Change in Reading (RF - RI): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ :Pass ❑ Fail; <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Z Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature <br />Date: 11-21-14 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />