Laserfiche WebLink
at <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 1 <br /> TYPE OF ACTION ❑ I.NEW PLAN 6 2.CHANGE OF INFORMATION Mol' <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs ATTHIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THF.,FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME C' � �Yom(- �'L1 � � <br /> M03. <br /> FACILITY SITE ADDRESS `OCC O Moo CITY �c, U Mo' <br /> II. EQUIPMENT T TING AND PREVENTIVE MAINTETllZANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06, <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT 1S SERVICED V 1.ANNUALLY ❑ 99.OTT IF-R(Specify): M07. <br /> III. MONITORING LOCATIONS <br /> 1-his monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mln. <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL.)SPACE(S)OR SECONDARY CONTAINMENT-VAULT(S) <br /> SECONDARY CONTAINMENT IS: 0 a.DEl b.LIQUID FILLED c.UNDER PRESSURE d.UNDER VACUUM <br /> DM11. <br /> PANEL MANUFACTURER: S2 Dy 1 �j M12 MODEL#: -TILS-356 M13 <br /> LEAK SENSOR MANUFACTURER: U2QC -Re f'e7Ct M14. MODEL#(S): 4;)3 N115 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: Mn. <br /> IN-TANK PROBE MANUFACTURER: M18. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS M20 <br /> Q ❑ b.DAILY/NIGFITL,Y ❑ c.WEEKLY <br /> [I d.MONT]ILY ❑ c.OTI IFR(Specify): M21, <br /> PROGRAMMED TESTS: ❑ a.0.1 h. El b.0.2 h. El c.OTI IER(Specify): M'-'- h23, <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL.PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25 <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FRE UENCY: a.ANNUALLY M26, M27. <br /> Q ❑ h.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ &VISUAL,MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> 99.OTHER(Specify): <br /> M28. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> L CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/T•RENCI-I(F-S)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 0 a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: -QM32. M33. <br /> LEAK SENSOR MANUFACTURER: f-e(ik r KOr_ - M34 MODFI,#(S): ab t M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES Q6 b.NO 1,136. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M37. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFT <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): M38. MODEL#(S): Mi9 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL#: M41 <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M°' <br /> WILL ELLDFATLLIRE/DISCONNEC-f1ON'I'RIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44 <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTITER(Specify) M45 M46, <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ h.WEEKLY* ❑ c.MIN.MONI LILY&EACI-1-1'IML:SYS-I-fiM OPERA 1'Ir.D*' M47 <br /> ' Requires agency approval -Allowed for monitoring of unhuried emergency generator fuel piping only per IISC§25281,5(h)(3) <br /> 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M48 <br /> SJCF,HD-d(07/03)-1/4 07/23/03 <br />