Laserfiche WebLink
SWRCB, January 2002 <br />SPii.i./OVF RFii.i, CONTAINMENT BOXES <br />Page of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: x Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum x Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Tape Measure Equipment Resolution: <br />sm <br />Spill Box # <br />Spill Box # Spill Box # <br />Spill Box # <br />Bucket Diameter: 12" <br />Bucket Depth: 13" <br />Wait time between applying <br />pressure/vacuum/water and 5 min <br />starting test: <br />Test Start Time: <br />9:17 <br />Initial Reading (Rj): <br />10" <br />Test End Time: <br />10:17 <br />Final Reading (RF): <br />10" <br />Test Duration: <br />1 hour <br />Change in Reading (RF -RI): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 drop <br />Test Result: <br />x Pass ❑ Fail <br />❑ Pass ❑ Fail ❑ Pass ❑ Fait <br />❑ Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />New spill bucket installed to relieve water intrusion due to rain. <br />