My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_2006-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 12:42:29 PM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2018
RECORD_ID
PR0231736
PE
2361
FACILITY_ID
FA0002562
FACILITY_NAME
Sutter Valley Hospitals dba Sutter Tracy Community Hospital
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
Blvd
City
Tracy
Zip
95376
APN
233-081-01
CURRENT_STATUS
01
SITE_LOCATION
1420 N Tracy Blvd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231736_1420 N TRACY_2006-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/30/04 MON 15:32 FAX 0 <br /> UNDERGROUND STIORAGE TANK , <br /> MONITORING PLAN—PAGE 2 <br /> .V1:•DIS ' ITS Ike l X!�I TClI ]G•: .• ; .. . :.: . <br /> MONITORING OF AREAS BENEATH DISPENSFR(S)IS PERFORMED USING THE FOLLOWING Mh"TFTOD(S)(Check all that apply) �y <br /> 0 1.CONTINUOUS FLFCTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTUREL M51- MODEL#- M52. <br /> LEAK SENSOR MANUFACTURER: Ms- MODEL#(S): <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDTBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ e YES ❑ b.NO0 <br /> WILL FAILURFIDISCONNECrION OF UDC MONrrORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN! ❑ a YES ❑ b-NO M� <br /> ❑ 2.MECHANTCAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)FIN UDC TRTPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: 8256- MODEL#(S): HS0 <br /> ❑ 3.V1$UAL MONITORING DONE: ❑ n.DAILY ❑ b.WEEKLY tacgaircc.gen y owh) M6u• <br /> 19 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) Nst' <br /> •:•.....,':Y J1.. hrt\a7-C%�l�:Ts` •:Liii :•.4+ �:+�V•bY.: <br /> ❑ 1.WE HAVE BEEN NOTIFYD BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT 11-14R"CL•D LEAK M7e• <br /> DETF.CTTON(FLD)FOR THE UST(S)COVERYD BY THIS PLAN.PER 23 CCR¢2644.1,ELY)TS PERFORMED EVERY 36 MONTHS AS REQTIIRED <br /> ' G: <br /> .TRAININ <br /> REFERENCE DOCUMENTS MAINTAINED AT FACiLTrY(Check all that apply) • <br /> 1. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MONTTORTNG F,QUIPMENT(Required) <br /> 1, ® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 711/2004) <br /> 4• ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5, ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB)PUBLICATION: "HANDBOOK FOR TANK OWNERS -MANUAL AND <br /> STATISTICAL INVENTORY RECONCTLFATTON" <br /> 7- ❑ S WRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99.❑ OTHER(Specify): <br /> MR1. <br /> Pccs000d with UST monitoring responsibilities are familiar with au of the above documenm relevant to dicir job duties and can access those documents when needed, <br /> By July i,2004,this facility willbave a"Designated UST tur"who has passed the operator exam admintstercd by the international Code Council(ICC). By July <br /> 1,2004,and annually theseaf>cr•,the "Dosignated UST Operator"will train facility umrployees in are proper operation and mnintenanoe of the UST systems.Thin <br /> training will include,but is not limited to,the following: <br /> D Operation of the UST system in a manner consistent with the facility's lest rrmnagcmcnt practices, <br /> ➢ The 9acility employee's role with regard to the leak detection equipment <br /> > The facility employee's role with regard to spills and overfills. <br /> > Wlhom to contact for emergencies and leak detection alarms• <br /> For facility employees hired on or after July],2004,the initial training will be conducted within 30 days of the date of biro. <br /> Pleuse use this section to include nay additional UST system monit(o'rring-related information(mg.,additional information required by your local agency): M85. <br /> • 'Y6...'g.EJ�.�7Vl:'i®.lu': :A _Vl\ AA1112114Rir5'_.......,,-. ....w.:.• <br /> AS OF 7/l/2004,THE"DESIGNATED UST OPERATOR"IDENTIFIED IN SECTION ILC OF THE CURLt- UST OPERATING PERMIT APPLICATION— <br /> FACTLITY FORM WILL HAVE.ULTIMATE AUTHORITY FOR PEMRMING TILE MONITORING ACfMTIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WTLL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF TTiB I•'ACL.I'1'Y'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR&2715@). <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to fire best of my knotivledge. <br /> OWNER/OPERATORSIGNATURE REPRESENTING DATE: Myr <br /> e �a Owner ash. <br /> IN Operator <br /> UWN UPERATORNAME(ptint): M97• OWNER/OPERA//TO��RTITLE <br /> (Agency Use Only) This plan has been reviewed and: Approved ❑Approved With Conditions ©Disapproved <br /> Local Agency Sigoanno: Date' <br /> Commenls/Specacd Conditions: <br /> SJCI;HD-d(07/03)•314 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.