Laserfiche WebLink
E M CC 0 Motel A1100 Overfill <br /> WHEATON RETAIL Prevention Valve OPV <br /> Field Operational Test Procedure TP-A1100 <br /> For Primary Float and Flapper Valve <br /> Service Tools Reauired: <br /> • EMCO Model A0081-1101 test tool •Scribe tool <br /> CAUTION: <br /> 1. Always barricade work area to keep pedestrians and vehicles from accessing the storage tank area during preventive maintenance <br /> and/or compliance testing of the phase I system. <br /> Securina the Flaoper Valve: RECR" <br /> I ky� E D <br /> . <br /> . 1.., OCT 2 92018 <br /> F' <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT" <br /> Step 1: Remove the spill container lid, Step 2: Remove the Model All 00 OPV <br /> fill cap and adapter from the tank fill from the tank fill riser. <br /> riser. Note: only remove manhole cover <br /> and water shroud system if necessary. <br /> iV <br /> Primary <br /> Float <br /> 21, <br /> i. <br /> i r f r <br /> t <br /> Step 3: Place the Model All 00 OPV on Figure 1: Correct position, primary float Figure 2: Improper position, primary <br /> its side with the primary float facing facing downward. float facing upward <br /> downward. Refer to Figures 1 and 2 <br /> for details. 1 <br />