My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> Address:J110 W. Turner Rd. Lodi 95242 Service Date:06/23/2008 <br /> F. In-Tank Gauging/SIR Equipment ®Check this box if tank gauging is used only for inventory control <br /> ❑Check this box if no tank gauging or SIR Equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring <br /> Complete the fol owing checklist <br /> ®Yes ❑No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ®Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑No* Was accuracy of system product level readings tested? <br /> ®Yes ❑No* Was accuracy of system water level readings tested? <br /> ®Yes ❑No* Were all probes reinstalled properly? <br /> ®Yes ❑No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H below,describe how and when these deficiencies were or will be corrected <br /> G. Line Leak Detectors (LLD): ®Check this box if LLDs are not installed <br /> Complete the fol owing checklist <br /> ❑Yes ❑NO* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD <br /> performance? <br /> ❑N/A Simulated Leak Rate(check all that apply) [:13.0g.p.h ❑0.1 g.p.h ❑0.2 g.p.h <br /> ❑Yes El No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is <br /> disabled or disconnected? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> malfunctions or fails a test? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ❑Yes ❑No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H below, describe how and when these deficiencies were or will be corrected <br /> H. Comments <br /> ALL FUNCTIONS ARE NORMAL,THEREFORE NO GROUND FAULTS ARE PRESENT AT THIS TIME. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.