Laserfiche WebLink
F] <br />r_1 <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />490-1 <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) I I I -I I1-1 11 1 1 1 11 <br />BUSINESS NAME (Same as FACILITY NAME) AT&T Cote UE231/LODICA02 <br />3. <br />BUSINESS SITE ADDRESS J110 W. TURNER RD. 103 <br />CITY LODI <br />104. <br />H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />X23 CCRX2632, 2634,263 8, - <br />2641)----------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------- <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY ❑ 99. OTHER (Specify): <br />490-3b <br />III. MONITORING LOCATIONS <br />to 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑ 2. SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)490-4 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />490-6 <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />PANEL MANUFACTURER: VEEDER ROOT 490-7. i MODEL #: TLS -350 Plus <br />490-8 <br />-------------------------------------------------------------------------------------------t--------------------------------------------------------------------------90-10:20 <br />490-9. � 4iy <br />LEAK SENSOR MANUFACTURER: Veeder Root MODEL #(S): 794390-4 <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(n. (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 490-12. MODEL #: <br />490-13 <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): <br />490-15 <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17 <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHER (Specify): <br />g•P• g.p.h. ( P fY)� <br />490-18 <br />490-19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490-20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />490-21 <br />490-22 <br />❑ 5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />Q (p fY)� <br />490-24 <br />a90-25 <br />❑ 99. OTHER (Specify): <br />490-26 <br />490-27 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S);(Check all that apply) <br />1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490-28 <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: ®a. DRY ❑b. LIQUID FILLED []c.PRESSURIZED ❑d. UNDER VACUUM <br />490-29 <br />--------------------------------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------- <br />PANEL MANUFACTURER: Veeder Root 490-30 ; MODEL #: TLS -350 <br />490-31 <br />----------------------------------------------------------------------------------------------------------------------------- - -+ --- --------------------------------------- <br />490-32 <br />LEAK SENSOR MANUFACTURER: Veeder Root i MODEL #(S): 794380-208 <br />490-33 <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ❑ a. YES ® b. NO <br />490-34 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ® b. NO <br />490-35 <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED (23 CRC2636 <br />490-36 <br />-----------------------------_--------------------------------------------------------------- <br />----------- --------------------------------------- - ------ ------------- <br />MLLD MANUFACTURER(S): 490-37 MODEL #(S): <br />490-38 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />490-39 <br />- -------- -------------------------------- - - - <br />ELLD MANUFACTURER(S)0-90.0-0.._ MODEL #(S): <br />------- <br />41 <br />0-90--- <br />-------------------------------------------------------------------------- <br />--------------------------------------------------- ----------#(S)------------------------------------------------------------ <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />490-42 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-43 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49044 <br />4. PIPE INTEGRITY TESTING 490-45 <br />TEST FREQUENCY ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) 490-46 490-47 <br />5. VISUAL PIPE MONITORING. <br />490-48 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ® c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* <br />490-49 <br />* Allowed for monitoring of unburied emergency enerator fuel piping only HSC 25281.5 3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA [23 CCR §2636(a)(3)]. <br />490-50 <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490-51 <br />❑ 99. OTHER (Specify) <br />490-52 <br />490-53 <br />