My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:19 AM
Creation date
6/23/2020 6:51:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UE231 <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 2 <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />490-1 <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />T. FACILITYINFORMATION <br />FACILITY ID # (Agency Use Only) I I IiI I IeI I I I I <br />I ' <br />BUSINESS NAME (Same as FACILITY NAME) AT&T COTe UE231/LODICA02 <br />3. <br />BUSINESS SITE ADDRESS 110 W TURNER RD #1 I13. <br />CITY LODI <br />104. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR §2632, 2634, 2638, 2641 <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY [199.OTHER (Specify): - - <br />ago38 <br />490-36 <br />M. MONITORING LOCATIONS ' <br />® 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 112. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)490-4 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S); <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />490-6 <br />PANEL MANUFACTURER: Veeder-Root 490-7. 1 MODEL #: TLS -350 Plus <br />490.8 <br />------------- --- ----- -------------- <br />LEAK SENSOR MANUFACTURER: Veeder-Root 490 9 MODEL #(S): (L2) 794390-420 <br />ago -w <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 490-12. MODEL #: <br />490-13 <br />--------------------- - -------------------- --------------- ------ --------------------- <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): <br />490-15 <br />-------------------------- - - ------------------------------------------------ <br />-- LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />LEAK <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17 <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHER S eci - <br />g•P• ( fy): <br />490x8 <br />g•P• P <br />490-19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490-20 <br />C14. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: Ela. 36 HOURS ❑ b. 60 HOURS <br />490-21 <br />490-22 <br />5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />TEST FREQUENCY: Ela. ANNUALLY E]b. BIENNIALLY E]c. OTHER (Specify): <br />490-24 <br />ago-zs <br />❑ 99. OTHER (Specify): <br />490.26 <br />ago -z7 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490-28 <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: ®a. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />490-29 <br />�-- --�-- <br />PANEL MANUFACTURER: 490-30 Veeder-Root MODEL #: TLS -350 Plus <br />490-31 <br />-� - <br />490-32 <br />LEAK SENSOR MANUFACTURER: Veeder-Root L MODEL #(S): (LI) 794380-208 <br />490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ❑ a. YES ® b. NO - <br />490-34 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ® b. NO <br />490-35 <br />El 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />490-36 <br />__ _ <br />MLLD MANUFACTURER(S): 490-37 - MODEL #(S): -- -- - <br />490-38 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />490-39 <br />- ------------ - <br />490-40. - <br />ELLD MANUFACTURER(S) MODEL #(S): <br />490-41 <br />--- - - ----- ---------- ------------------- ------------------------------------------- <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />49042 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49043 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49044 <br />El 4. PIPE INTEGRITY TESTING 49045 <br />TEST FREQUENCY ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHERS eci 490-46 49047 <br />® 5. VISUAL PIPE MONITORING. <br />490-48 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ® a MIN. MONTHLY & EACH TIME SYSTEM OPERATED* <br />490-49 <br />* Allowed for monitoring ofunburied emeEgency generator fuel piping only pa HSC §25281.5(b)(3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR §2636(a)(3)]. <br />490-50 <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490-51 <br />❑ 99. OTHER (Specify) <br />490-52 <br />490-53 <br />UPCF UST -D Rev. (12/2007) <br />
The URL can be used to link to this page
Your browser does not support the video tag.