My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_1991-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:06:49 PM
Creation date
6/23/2020 6:51:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-1994
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_1991-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />L� <br />P <br />I <br />0 <br />F, <br />7 <br />j <br />F <br />E <br />and stop at a preset time, (i.e. Daily, -Weekly or <br />Monthly). Each individual tank can be <br />programmed separately using function 87 and <br />88. Function 89 will print the Auto Leak Detect <br />set-up information. When the test frequency is <br />set for weekly or monthly testing, a notice will <br />be printed 24 hours in advance of the test start <br />time as a reminder. <br />Leak Detect Test results are printed automat- <br />ically at the beginning and end of the test <br />period. Results are printed only for the tank or <br />tanks selected. The reports include tank inven- <br />tory at the beginning of the test, with pass/fail <br />results and inventory printed at the end of the <br />test. The Last Leak Test result for each tank is <br />stored in memory and can be printed by press- <br />ing the Print key, PRINT, selecting choice 5, <br />and pressing ENT. <br />14 <br />E <br />The X76 ETM uses Seiko thermal paper #TP201-21 1 - <br />25c, 21/4" x 75'. Check with your local API/Ronan dis- <br />tributor or call 1-800-643-0085. <br />Open the controller door. <br />2. Remove the used paper roll, and save the roll shaft. <br />3. Put roll shaft in the new roll of paper. <br />4. Cut end of the new roll to a point and insert paper <br />between green printer board and the black printer <br />mechanism, until the tip of the paper extends out <br />of the printer on the front side of the controller. Pull <br />paper from front side until cut edges are free of <br />machine. <br />5. Reset the new paper roll in the slot on the bracket. <br />6. Select print to check printer operation. If there are <br />no visible characters, then the paper is reversed. <br />Remove the paper and re -feed with the paper side <br />reversed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.