My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_1991-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:06:49 PM
Creation date
6/23/2020 6:51:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-1994
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_1991-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 9 <br />A S ENGINEERING INC. <br />PLANNING • ENGINEERING • CONSTRUCTION MANAGEMENT <br />49 QUAIL COURT, STE. 303, WALNUT CREEK, CA. 94596 • PHONE: 510-933-0578 • FAX 510-933-0588 <br />December 1, 1994 <br />r-1 <br />- <br />C-3 <br />CA <br />-•"'�: <br />San Joaquin County <br />3 <br />�_ <br />Environmental Health Division <br />'4=' <br />445 N. San Joaquin Street <br />t- <br />Stockton, Ca 95201 <br />CA <br />Attn: Eric Trevena <br />Subj: Shell Station located @ 880 Victor Road, Lodi, California <br />Dear Eric, <br />The following information is similar to that provided to L.T. Briggs for the Stockton location. All <br />arrangements made on that project would apply also to this location. They are as follows: <br />1) U.S.A. Dig will be contacted prior to any excavation activities by the General <br />Contractor. <br />2) Soil samples will be taken and analyzed for leaded gasoline in addition to <br />unleaded gasoline, this is due to the fact that the station previously stored <br />leaded gasoline. <br />3) Steve Sasson of Unit 4 will be contacted regarding an over excavation plan. <br />4) The Contractor's safety supervisor (or site foreman) is Mr. Wayne Henderson. <br />5) See attached cut -sheet for the overfill prevention device - <br />OPW Model # 61 SO -400C. <br />6) All product and vapor recovery lines slope 1/4" per foot minimum down from the <br />dispensers back to the tanks. See notes on piping plan drawing #TP -1. <br />7) The piping system is a pressure system. <br />207 W. ALAMEDA AVE., STE. 202 • BURBANK, CA 91502 • TELEPHONE: 81 B-842-3644 • FAX: 81 B-842-3760 <br />
The URL can be used to link to this page
Your browser does not support the video tag.