Laserfiche WebLink
E <br />• Entry into excavations greater than 4 feet deep is <br />prohibited, unless the requirements of T8 CCR 1541 are <br />met. <br />• Hazards associated with general construction may <br />occur during the course of construction. Personnel <br />should be alert and prevent as well as avoid these <br />hazards. <br />• When tank removal is part of scope of work, <br />there is a significant potential for hazards <br />from falling loads when lifting and removing <br />tanks. Workers must be especially alert to <br />this hazard. <br />• During general construction activities, there <br />is also a potential for general (construction <br />type) safety hazards. This plan does not <br />address general safety in detail. if <br />personnel are frequently reminded and will <br />cooperate in being courteous, careful, alert, <br />and thoughtful of outlines safety procedures, <br />and it they use common sense in actions and in <br />considering probable consequences, much will <br />already have been accomplished to insure a <br />5 <br />