My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2000-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 3:59:11 PM
Creation date
6/23/2020 6:51:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2003
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2000-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AI9:I.1 IICT T"cTAi 1 ATTnkl TucocrTTnu oarnon <br />INITIAL INSPECTIONS <br />A <br />I <br />3. <br />INSPECTION AND TEST <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />(e)) <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />BRINE(LIQUID ANNULAR): OTHER: <br />R <br />T <br />°� <br />4. <br />0 <br />I <br />NRS/MIN: Dnc. hxw- <br />NV '8. <br />F <br />V <br />A <br />5. <br />TANK APPROPRIATELY <br />E <br />L <br />(1)) <br />9. <br />� <br />D <br />S <br />PEI <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR <br />2636 <br />ITEM OR EQUIPMENT INSPECTED <br />DA E <br />OVERSPILL PERFORMANCE TEST <br />(CCR <br />3 dZ <br />(b) (1) (C)) <br />V <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />O L <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />RV <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />Q <br />3. <br />INSPECTION AND TEST <br />OF SECONDARY CONTAINMENT: <br />HOLIDAY: N <br />2636 <br />(e)) <br />Q U�7. <br />u U <br />VACUUM: �` SOAP: <br />PSI: HRS/MIN: 3o <br />BRINE(LIQUID ANNULAR): OTHER: <br />3IZi�1b2 <br />(CCR <br />°� <br />4. <br />PRIMARY TANK TEST: <br />PSI: II Z <br />NRS/MIN: Dnc. hxw- <br />NV '8. <br />F <br />LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) <br />HRS: <br />5. <br />TANK APPROPRIATELY <br />PLACED WITH APPROVED BACKFILL <br />(API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />16 <br />Q <br />6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) J <br />1 3 �j M �� <br />(CCR <br />2636 <br />(e)) <br />Q U�7. <br />u U <br />l� <br />(� <br />SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MINI: <br />77 <br />.� <br />2 p OTHER: <br />(CCR <br />2636 <br />(e)) <br />L( <br />ll <br />D <br />a �.� <br />NV '8. <br />F <br />LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) <br />HRS: <br />(CCR <br />2635 <br />(a) (4)) <br />/� <br />V <br />(1)) <br />9. <br />� <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />PEI <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR <br />2636 <br />(g)) <br />10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR <br />2635 <br />(b) (1) (C)) <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR <br />2636 <br />(b)) <br />OVERFILL PROTECTION INSTALLED/APPROVED Lov1L 4V -r�(Nv_ <br />(CCR <br />2635 <br />PIPING SLOPES TO COLLECTION SUMP <br />(2)) <br />(CCR <br />2636 <br />(c)(1)) <br />FINAL INSPECTION <br />16 <br />07_ <br />ebof3. <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br />(CCR <br />2632 <br />(c) <br />(2)) <br />l� <br />(� <br />ft <br />4. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR <br />2632 <br />(c) <br />(2)) <br />a �.� <br />✓ <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION _ ReS,,�1s <br />(CCR <br />2643 <br />(c) <br />(1)) <br />16. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR <br />2636 <br />(g)) <br />17. <br />BALL FLOAT VALVES INSTALLED <br />18. <br />OVERFILL PROTECTION INSTALLED/APPROVED Lov1L 4V -r�(Nv_ <br />(CCR <br />2635 <br />(b) <br />(2)) <br />19. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />API <br />tllo <br />20. <br />TANK INTEGRITY TEST (PASSING HARD COPY) R s�,��, <br />(CCR <br />2635 <br />(a) <br />(5)) <br />L <br />gU <br />21. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR <br />2632 <br />(d)) <br />22. <br />"C" FORM COMPLETED AND SUBMITTED <br />(CCR <br />2635 <br />(d)) <br />23. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR <br />2630-2636) <br />24. <br />ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br />(H+S <br />CODE <br />25284) <br />COMMENTS <br />EH23-006 9/95�� A <br />a <br />10 L,9�- <br />
The URL can be used to link to this page
Your browser does not support the video tag.