My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2000-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 3:59:11 PM
Creation date
6/23/2020 6:51:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2003
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2000-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aitoring System Certification <br /> Site Address: 800 VICTOR ROAD Date of Testing/Service: 08/08/2003 <br /> F. In-Tank Gauging/SIR Equipment Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ElYes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> El Yes ®No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> E Yes ®No* Was accuracy of system product level readings tested? <br /> EYes ❑No* Was accuracy of system water level readings tested? <br /> r-X-j Yes ❑No* Were all probes reinstalled properly? <br /> ®Yes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes F-1 No* ®N/A (Check all that apply)Simulated leak rate: X❑ 3 g.p.h❑0.1 g.p.hE10.2 g.p.h <br /> r-X-j Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes ®No* Was the testing apparatus properly calibrated? <br /> M Yes ❑No* ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes [:]No* ❑X N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ®Yes ❑No* Q N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes []No* Q N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No* Q N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 Yes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.