Laserfiche WebLink
r <br /> Test Date: 12/20/2002 <br /> X <br /> Work Order: 2224852 <br /> SECONDARY CONTAINMENT TEST RESULTS <br /> SUMP TESTS <br /> Type Tank or Disp Manufacturer Model or Diam./Width/Length Depth Test Method Start Initial Level Finish FinalPass/ <br /> # Material (") (") Time Level Change Time Result Fail <br /> STP Sump SUP Fiberglass 42 70 1 Hydrostatic-VPLT 10:37 20" -.08844 10:47 +1.382 Fail <br /> STP Sump REG Fiberglass 42 70 Hydrostatic-VPLT 09:49 20" -.00042 1019 +.006 Pass <br /> STP Sump DSL Western Fiberglass Fiberglass 42 53 Hydrostatic-VPLT 11:45 18" -.00025 12:15 +.004 Pass <br /> Dispenser Pan 1/2 Phil-Tite Fiberglass 30/42 26 Hydrostatic-VPLT 13:19 12" +.00027 13:34 -.006 Pass <br /> Dispenser Pan 3/4 Phil-Tite Fiberglass 30/42 26 Hydrostatic-VPLT 13:30 12" -.00056 13:45 +.013 Pass <br /> Dispenser Pan 5/6 Phil-Tite Fiberglass 30/42 26 Hydrostatic-VPLT 12:34 12" -.07472 12:39 +1.779 Fail <br /> Dispenser Pan 7/8 Phil-Tite Fiberglass 30/42 26 Hydrostatic-VPLT Fail <br /> Dispenser Pan 9/10 Western Fiberglass Fiberglass 20/18 26 Hydrostatic-VPLT 12:33 12" +.00002 12:48 .000 Pass <br /> Comments:Disp 7/8: Loss to fast to establish test start. <br />