My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:30:52 PM
Creation date
6/23/2020 6:51:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\880\PR0231746\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Monitoring System Certification <br /> El Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform Ieak detection monitoring <br /> Complete the following checklist: <br /> Exye -I <br /> x yes C3 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes <br /> x yes L3 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> X x y a <br /> yes [I No* Was accuracy of system product level roadings tested? <br /> • yes 0 No* Was accuracy of system water level readings tested? <br /> • yes0 No* Were 411 probes reinstalled properly? <br /> 0* <br /> x Yes EONo* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> in the Section H,below,describe'how,and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): 0 Check this box if LLDs am not installed. <br /> Cam Iete the follows na checklist: <br /> E3 Yes 13 No* For equipment stun-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> El N/A (Check all that apply) Simulated leak rate: x 3 g.p.h.; 0 0.1 g.p.h; [10.2 g.p.h. <br /> ID yes 11 N0* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes U No* Was the testing apparatus properly calibrated? <br /> 13 yes 11 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 13 N/A <br /> 0 Yes C1 NO* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 yes <br /> ❑ <br /> El Yes <br /> N/A <br /> El Yes 0 No <br /> * For electronic LLDs, does the turbine automatically shut Off if any portion of the monitoring system is disabled <br /> m Zs' does <br /> [I N/A or disconnecVeed?� <br /> e mtr. <br /> m <br /> E3 Yes 0 NO* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring <br /> k Jul system malfunctions <br /> I C) N/A Or fails a test? <br /> ri Yes 0 No* For electronic LLDs,have al <br /> Y I I accessible wiring connections been visually inspected? <br /> C] N/A <br /> 0 Yes [I No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In <br /> the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> UN-036-1/4 <br /> www.unidoes-org Rev.01/26/06 <br /> too in NQIIVJS EIDIAHE[S H 09CZ TLC 9T6 YVA U:CT OTOZ/OT/ZO <br />
The URL can be used to link to this page
Your browser does not support the video tag.