My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:30:52 PM
Creation date
6/23/2020 6:51:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\880\PR0231746\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mm� <br />77j �PW 1, <br />Veeder-Roots California Air Resources Board <br />(CARB) certified In -Station Diagnostic (LSD) <br />equipment is designed to monitor the collection <br />and containment of vapors by vapor recovery <br />equipment, Using the existing Veeder-Root TI-S- <br />350/EMC platform, probes and Dispenser <br />Interface Module (DIM) cards, the ISD software <br />continuously monitors the vapor recovery equip- <br />ment, maintains test records, provides test <br />reports, and generates warnings / alarms follow- <br />ing equipment failures. <br />TheISD system includes the following new com- <br />ponents: <br />Vapor Flow Meter (Sensor) - One per <br />dispenser, designed to measure the volume of <br />vapors collected during vehicle refueling for <br />vapor collection monitoring <br />Vapor Pressure Sensor - One per station, <br />designed to continuously measure contain- <br />ment tank pressures for leakage and over- <br />pressure conditions for vapor containment <br />monitoring <br />ISD Software Enhancement Module (SEM) - <br />One per TIS, activates ISD software <br />technology <br />ISD can be added to any TLS -350 <br />allowing you to leverage your <br />invew"K and centralize moni- <br />toring and recording activities. <br />• KVMEM 2 Board - (Non -Volatile Memory) One <br />per TLS, provides memory expansion necessary for ISD <br />report storage <br />As of the September lm, 2005 implementation date, ISD <br />systems are required for new and rebuild stations in CA <br />that dispense more then 1.8 million gallons / year. The <br />implementation date for new• and rebuild stations dispens- <br />ing more then 600 million gallons / year is April 2006. For <br />both throughputs, existing stations must retrofit an ISD <br />system within four years from the implementation date. <br />For details as well as to view the CARB Executive Order <br />requiring Enhanced Vapor Recovery (EVA) and In -Station <br />Diagnostics (ISD) see the CARB website at <br />http:/Avww.arb.ca.gov/vapor/eos/eo-vr2O2/eo-vr2O2a.htm. <br />W1 0 . . `2 <br />212 <br />• Intetlaces to the edsting smart Sens" Interface Module (either the I hqm or 8 <br />i" versim) <br />• Shn* histallation, con"ible with all dqemas <br />• Underwriters labmtories (U]L) limed <br />• Continuous marataift of the vapw reeme-ty system ind"rig, notifitation if die "ens <br />perforIHS irce- drops below requottl level <br />• Ardirve the ftpons, rapired to nmet Cahlomis regulations <br />• Reduction in ernissions related to failed or degading. equilm"t <br />• tem -dip owthig, TLS -350 equVwnt <br />
The URL can be used to link to this page
Your browser does not support the video tag.