Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: ,U( Check this box if tank gauging is used only for inventory control, <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the followin checklist: <br />Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes ❑ No* Was accuracy of system product level readings tested? <br />Yes ® No* Was accuracy of system water level readings tested? <br />Yes ❑ NO Were all probes reinstalled properly? <br />f� Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />ComTete <br />the following <br />El No* <br />O N/A <br />checklist: <br />For equipment start-up or annual equipment certifihatiO 0 I as ag.p hie ak ❑ p simulate <br />(Check all that apply) Simulated leak rate: W g.p..; p h to verify LLD performance? <br />Yes <br />® No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a Leak? <br />C] Yes <br />(� N/A <br />does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ Yes <br />❑ No* <br />For electronic LLDs, <br />0 N/A <br />or disconnected? <br />LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />❑ Yes <br />❑ No* <br />For electronic <br />t N/A <br />or fails a test? <br />For LLDs, have all accessible wiring connections been visually inspected? <br />O Yes <br />❑ No* <br />electronic <br />es <br />U N/A <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />below, describe how and when these deficiencies were or will be corrected. <br />* In the Section <br />H, <br />H. Comments: <br />03/01 <br />Page 3 of 3 <br />