Laserfiche WebLink
01/08/2010 10:04 FAX 916 371 2380 BZ SERVICE STATION 121002 <br />SWRC13,, January 2002 <br />Page __ of <br />Secondary Containment Testing Report Foram <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of thisform to report resultsfor all components tested The completedform, written test procedures, and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FAr7TjTV 11V90RMATTf1N <br />a?aciiity Name; - - -- --- - — - - -- ---- - - Date of Testing: <br />Facility Address; <br />Facility Contact: Phone: C' <br />Date Local Agency Was Noti ed of Testing <br />Name of Local Agency Inspector (f present during testing): 1�� , 1� � i <br />Company Name: B.Z. Service Station Maintenance <br />Technician Conducting Test: <br />TC -C. <br />credentials; X CSLB Licensed Contractor <br />❑ SWRCB Licensed Tank Tester <br />License Type: <br />Manufacturer <br />Manufacturer Co <br />License Number: 433159 <br />Training <br />ones s Date Training Exp )res <br />�00 <br />w <br />3. SUMMARY 4F TEST RESULTS <br />If hydrostatic testing was performed, desoribre what was done with the water after completion of tests: <br />�,�x .�xin 1�!"aa3 Lim �;j�r •'n�i �e Vuo J I�„k4K j ,I a '?L,-1-AA16 av, f3l +4 <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FAR CONDUCTING THIS TESTING <br />To the best of my knowledge, tine fasts stated in this document are accurate and Its jW1l compliance with legal requirements <br />Technician'sSignaturef .'..�� Date:_ <br />L�- <br />�00 <br />w <br />i <br />� . Y �-, <br />070 <br />■ <br />0�0 <br />��L <br />mom <br />If hydrostatic testing was performed, desoribre what was done with the water after completion of tests: <br />�,�x .�xin 1�!"aa3 Lim �;j�r •'n�i �e Vuo J I�„k4K j ,I a '?L,-1-AA16 av, f3l +4 <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FAR CONDUCTING THIS TESTING <br />To the best of my knowledge, tine fasts stated in this document are accurate and Its jW1l compliance with legal requirements <br />Technician'sSignaturef .'..�� Date:_ <br />L�- <br />