Laserfiche WebLink
01/0'8/2010 10:05 FAX 916 371 2380 BZ SERVICE STATION Q004 <br />SWRCB, January 2002 Page __-_ of <br />6. PIPING SUMP TES'T'ING <br />Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑ Professional Engineer <br />0 Other (Spec} <br />Test Method Used: 0 Pressure ❑ Vacuum Iydrostatic <br />❑ Other (Spec) <br />Test Fyuipment Used: Equipment Resolution: <br />' If the entire depth of the sump is not tested, spocify how much Was tested. If the answer to my of tho questions indicated with an <br />asterisk M is "NO" m "NA", the entire sump must be tasted, (See SWRCB LQ -150) <br />I r ......._..-.... <br />Sump # <br />Sump # <br />Sump #Sump <br /># <br />Sump Diameter: <br />r + r <br />�r + � <br />� t <br />Sump Depth: <br />— <br />t <br />Sump Material: <br />r <br />Haight fromTank Tap to Top of <br />r <br />Hi est Piping Penetration: <br />It <br />j it <br />Height from Tank Top tolowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />t <br />r <br />Portion of Sump Tested' <br />Docs turbine shut down when <br />„ <br />sump sensor detects liquid (both <br />0, Yes <br />NA 0 Yes 0 No ❑ NA, <br />❑ Yep .o ❑ NA <br />❑ Yes ❑ No [INA <br />roduct and water ? <br />Turbine shutdown response tune <br />Is system programmed for fail-safe <br />..--- <br />shutdown?" <br />0 Yes ❑ No <br />❑ NA .❑ ONO ❑ <br />0 Yes Q No [INA <br />❑ Yes Q No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ No <br />❑ NA 0 Yes ❑ No ❑ NA <br />❑ Yes❑ A <br />0 Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />� <br />4 e <br />Initial Reading (R,): <br />C <br />Test End Time: <br />Final Reading (IIP): <br />Test Duration: <br />' <br />Change in Reading <br />Pass/Fail Threshold or Criteria: <br />r <br />Was sensor removed for testing? <br />Q Yes ❑ Na <br />❑ NA ❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No [DNA <br />❑ Yes ONO [INA <br />Was sensor properly reptacad and <br />verified functional after testin ? <br />0 Yes ❑ No <br />Q NA ❑Yes ❑ No ❑ NA <br />❑ Yes ❑ No 0 NA <br />❑ Yes ❑ No 0 NA <br />Comments — include information on repairs made --Prior <br />to testtn , and recommendedodlory-u or arced tBsts <br />' If the entire depth of the sump is not tested, spocify how much Was tested. If the answer to my of tho questions indicated with an <br />asterisk M is "NO" m "NA", the entire sump must be tasted, (See SWRCB LQ -150) <br />I r ......._..-.... <br />