Laserfiche WebLink
E" <br />Monitoring System Certiffeation <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment, is used to perform leak detection monitoring. <br />Complete the following checklist: <br />x Yes ❑ No* ];las all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />X Yes. ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />X Yes ❑ No* Was accuracy of system product Ievel readings tested? <br />X Yes ❑ No* Was accuracy of system water level readings tested? <br />X Yes 0 No* Were all probes reinstalled properly? <br />X Yes D No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section FI, below, describe how and when these deficiencies were or will he Corrected. <br />G. Litre Leak, Detectors (LLD): ® Check this box if LLDs are not installed <br />Com lete thefollowin checklist. <br />❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A (Check all that apply) Simulated leak rate: X 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p,h. <br />❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br />M Yes ❑ No* Was the testing apparatus properly calibrated? <br />❑ Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />H. Comments: <br />Pae 3 <br />UN -036 —1/d www.unidoes.org Rev. 01/25/06 <br />rooln NQI,VIS EIaIA$EIS ZS 09CZ TLC 9I6 XVa 60:OT OTOZ/BO/TO <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLD$, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLD9, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />❑ N/A <br />or fails a test? <br />❑ Yes <br />p No* <br />For electronic LLDs, have all accessible 'wiring connections been visually inspected? <br />❑ NIA <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, <br />below, describe how and when these deficiencies were or will he corrected. <br />H. Comments: <br />Pae 3 <br />UN -036 —1/d www.unidoes.org Rev. 01/25/06 <br />rooln NQI,VIS EIaIA$EIS ZS 09CZ TLC 9I6 XVa 60:OT OTOZ/BO/TO <br />