My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:34:55 PM
Creation date
6/23/2020 6:51:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> UNIFIED PROGRAM CONSOLIDATED FORMW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pagel of 2) <br /> TYPE OF ACTION ❑I NEW PLAN 2.CHANGE OF INFORMATION 4901 <br /> PLAN TYPE Ef 1.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 490.2 <br /> (Check one item only) 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S.)- <br /> I. FACII371rY INFORMATION <br /> FACILITY ID#(Agency Use Only) - - ' <br /> BUSINESS NAME(Same as FACILITY NAME) C LD N® G CC- 3. <br /> BUSINESS SITE ADDRESS R ed E. Vi(!-TO R3 103_ Com' ,D 3)-L 104. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641 <br /> 49048 <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY ❑ 99.OTHER(Specify): 4903b <br /> III.MONITO G-LAXATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o-4 <br /> IV.TANK MONITORING IS PERFORNED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIA[.)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CR§2632,2634 <br /> . ) <br /> SECONDARY CONTAINMENT IS: �y a.DRY b.LIQUID FELLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49D-6 <br /> PANEL MANUFACTURER: r A P-00 490-7' MODEL#: T4 S 3So 49" <br /> LEAK SENSOR MANUFACTURER (ZP c-T 490-9_ MODEL#(S): O 30 1 490.10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE A&L TANKIS).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 49016 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> 490.18 <br /> PROGRAMMED TESTS: ❑ a.0.t g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 4 22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 4�i4 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490.26 <br /> ❑99.OTHER (Specify): 490.27 <br /> V.PIPE MONMIMG IS PERFORMD USING ME FOLLOWING METHOD(S)(Check all that apply) <br /> CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-29 ALARMS. (23 CCR§2636) 490-29 <br /> / <br /> SECONDARY CONTAINMENT IS:[Ja.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM <br /> PANEL MANUFACTURER V 0 b j 490.30 MODEL#: jl�S, 3 5 D 490-31 <br /> LEAK SENSOR MANUFACTURER _V E O T 490.32 MODEL#(S): 20'a 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. Ria.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. MA YES ❑b.NO 490.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 26 490-36 <br /> MLLDMANUFACTURER(S): F C TP O v T 17 MODEL L,D-2000 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g4Lh.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) ONO 1MODEL#(S): 490-01 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.43 <br /> ELLD FAMUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 49o45 <br /> TEST FRE UENCY Ej a.ANNUALLY Q b.EVERY 3 YEARS Q c.OTHER S i 490-46490.47 <br /> 5.VISUAL PIPE MONITORING. 490-49 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490649 <br /> • for ofudRmed fuel i' HSC 28L3 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§ aX3)]. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 49052 <br /> ❑ 1 R(Specify) 490.53 <br /> UPCIF LIST-D(1 Z7M 114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.