Laserfiche WebLink
D. Results of TestinglServicing 0 ECEIVED <br />Software Version Installed: 332.00 OU 2 5 2016 <br />r.nmnlete the ffilinwino checklist: <br />rg <br />ffm; <br />I Is the audible alarm operational? AV VEATAL EAUM <br />is the visual alarm operational? DEPARTM—ENT- <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />lmw�� <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? -a4- <br />If alarms e relayed to a remote monitoring station, is communications equipment (e.g., modem) <br />operational? <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary wntainment <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />Emi <br />positive shut -down? (Check all that apply) E]Sump/Trench Sensors; Z Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? E] Yes; EJ No. <br />— <br />lff�ffvlv <br />- - <br />"111119effifflOW #_ # III I . #' - <br />W <br />I <br />12=1 <br />rr_4� <br />7w as any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />11 <br />liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />�=Was <br />l Z Product; 0 Water. If yes, describe causes in Section E, below. <br />I IN M- <br />Is al I -monitoring equipment operational per manufacturer's specifications? <br />*In Section E below, describe how and when these deficiencies were or will be corrected. <br />Monitoring Certification Test Report <br />2 of 4 <br />