Laserfiche WebLink
SAN JOAQUIN COUNTY <br />3ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />IFac il' ame: Inspection Date: <br />AA I ) 1 -Iz - <br />Onsite Service Technician's Name: ICC Service Technician/Installer Exp. Date: anufacturer Training: <br />�, -1 <br />lr <br />This UST facility is APPROVED to operate <br />SERVICE <br />Leak detector <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ mechanical <br />Model: <br />❑ Caldwell System ❑ Other <br />❑ electronic <br />Serial #: <br />❑ <br />❑ line test programmed <br />❑ Caldwell System ❑ Other <br />Leak detector <br />Primary piping testing at: <br />❑ <br />❑ mechanical <br />Model: <br />minutes <br />❑ electronic <br />Serial #: <br />❑ line test V22Lammed <br />Sump(s) UST(s) <br />sor <br />Testing for the above components are next due by: <br />❑ positive shutdown <br />Model: o <br />Cold start of monitoring panel <br />❑ fail safe <br />Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown <br />Model: <br />❑ fail safe <br />Serial #: <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown <br />Model: <br />❑ fail safe <br />Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LIS letter 150-1) <br />This UST facility is APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />111 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 21 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br />Rev 4/30/12 <br />