Laserfiche WebLink
9-28-15 <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205-6232 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Emily Crain <br />BZ Service Station Maintenance <br />P.O. Box 933 <br />N. Sacramento, CA 95691 <br />Re: ARCO AM PM 880 E. Victor Rd. Lodi, CA 95240 <br />DIRECTOR <br />Linda Turkatte, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Rodney Estrada, REHS <br />Adrienne Ellsaesser, REHS <br />►,do»tii 8 <br />SR0073242 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to install an OPW 2100 series spill container and an OPW 61 SALP <br />fill adaptor on the diesel underground storage tank (UST) system at the above noted address. <br />The permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Aris Veloso at (209) 468-3453 to arrange the following inspection appointments <br />(a 48-hour notice is required for inspection appointments). Please be aware that <br />inspections for emergency work must be scheduled within five days of permit approval. <br />a. Corrosion protection: Verify corrosion protection for direct bury spill bucket prior to <br />backfilling. <br />b. Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br />test (or equivalent). Proper drainage must also be verified. <br />Please be aware that the facility cannot receive fuel in the diesel tank prior to the <br />EHD inspection and approval. <br />4. Since concrete will be broken near the diesel UST, a secondary containment test must <br />be performed on the diesel UST once concrete is poured in accordance with the <br />manufacturer's guidelines. <br />5. Any individual performing the work of a service technician must meet the following <br />qualifications: <br />a. Possess or be employed by a person who possesses one of several permissible <br />valid, current contractor's licenses issued by the Contractors State License Board <br />(may be issued to the installation company), or a Tank Tester's license issued to the <br />individual by the State Water Board, and <br />