My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:40:14 PM
Creation date
6/23/2020 6:51:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of TestinglServicing <br />Software Version Installed: 332.00 <br />C Dili Eete <br />lite <br />np- cnecKilst; <br />is the audible alarm operational? <br />Z yes <br />0 No* <br />Z Yes <br />0 No* <br />Is the visual alarm operational? <br />ZYVe_s_E <br />P <br />❑ -No* <br />Were all sensors visually inspected, functionally tested. and contirmed operational? . .... . .. . ..... <br />Yes <br />Z Z Y� <br />No* <br />Were all sensors installed at lowest point of secondary containment aid positioned so that other equipment will <br />not interfere with their proper operation? <br />-Yes <br />Fl No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g_ nioden)) <br />El N/A <br />operational? <br />Yes <br />- <br />0 No* <br />automatically shot down if the pipim, secondary containment <br />For pressurized piping systems, does the turbine autornalic . -.7 <br />0 N1,`A <br />monitoring systern detects a leak, filils to uperate or is elec trically disconnected' It'ves: which sensors, initiate <br />I <br />positive shut -down" (Check all Mal a1p4v) OSurnpl,"french Sensors', Z Dispenser Containment Senso- <br />Did you confirm positive shut -down due to leaks and sensor failure -disconnection? 0 Yes-, C, No. <br />JE Yes <br />0 No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.. no <br />E] NIA <br />mechanical overfill prevention valve is installed), is the overfill warning alai -in visible and audible at the tank <br />fill point(s) and operating properly? 11fiso, at what percent of tank capacity does the alarm trigger? 90% <br />[3 Yes* <br />®No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />0 Yes* <br />H No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all thal apply) <br />[I Product; [I Water. If yes, describe causes in Section E, below. <br />0 Yes <br />0 No* <br />- ,viewed to ensure proper setting <br />Was monitoring system set-up re s? Attach set up reports, if applicable.......... <br />is all -monitoring equipment operational per manufacturer's specifications? <br />*In Section E below, describe how and when triese aeticiencies were or woe tw cui I VVEVU. <br />E. Comments: <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.