My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:40:14 PM
Creation date
6/23/2020 6:51:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rks Fuel & Food,, Inc. <br />E VICTOR RD <br />I, CA 95240 <br />Continuous Monitoring of Piping Secondary Containment <br />Secondary Containment Panel Manufacturer <br />Panel Model # <br />Leak Sensor Manufacturer <br />Leak Sensor Model # <br />CERSID <br />10181491 <br />UST Tank # <br />Leak Alarm Triggers Automatic Pump Shutdown <br />Failure/Disconnect Triggers Pump Shutdown <br />2S Mechanical Line Leak Detector Performs 3 GPH Leak Test <br />LLD Manufacturer MLLD Model <br />MI 99-LD2000 <br />Electronic Line Leak Detector Performs 3 GPM Leak Test <br />10 Manufacturer ELLD Programmed In -Line Testing ELLD Triggers Automatic Pump Shutdown <br />1D Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br />Pipeline Integrity Testing Visual Pipeline Monitoring <br />peline Integrity Testing Frequency Visual Pipeline Monitoring Frequency <br />Suction Piping Meets Exemption Criteria <br />No Regulated Piping Per Health and Safety Code, Division 20, Chapter 6.7 Is Connected To The Tank System <br />Other Pipeline Monitoring <br />Monitoring <br />Detection of Leak into UDC Triggers Audible and Visual Alarms <br />tinuous <br />Yes <br />UDC Leak Alarm Triggers Automatic Pump Shutdown <br />Panel Manufacturer <br />Yes <br />DER ROOT <br />Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br />Panel Model # <br />Yes <br />350 <br />UDC Monitoring Stops Flow of Product at Dispenser <br />Leak Sensor Manufacturer <br />DER ROOT <br />UDC Construction <br />Leak Sensor Model <br />Single -walled <br />UDC Secondary Containment Monitoring <br />Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br />ELD Testing <br />Secondary Containment Testing <br />Printed on 2/19/2015 10:58 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.