Laserfiche WebLink
Software Version Installed: 332.00 <br />P <br />DEC 0 12017 <br />Z Yes <br />❑ No* <br />Is the audible alarm operational? DEPARTMEN <br />0 Yes <br />❑ No* <br />Is the visual alarm operational? <br />®Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Z Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modern) <br />0 N/A <br />operational? <br />-Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />C3 N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) SSump/Trench Sensors, [D Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failureidisconnection? 10 Yes; ❑ No. <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br />0 N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so. at what percent of tank capacity does the alarm trigger? 90 % <br />❑ Yes* <br />0 No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />® Yes* <br />❑ No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; 9 Water. If yes, describe causes in Section E, below. <br />® Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />_Z Yes <br />❑ No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />E. CommentsTumped Water from DSL STP. <br />Monitoring Certification Test Report 2 of 4 <br />