Laserfiche WebLink
19. Piping (cross-section*gram, including connections to tank and dsers). <br />(A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br />_/ Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)1, or <br />!l Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b) (2)(C)3, or <br />(8) vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmos (a) (3)] <br />R <br />EC <br />Sloped so contents of the pipe will drain back 111nZae suction is <br />released. <br />N O V 24 1097 <br />No valves or pumps installed below grade_ <br />ENV lROW r(,di`Ai_ Hi.�imi`N <br />Inspection method provided to demonstrate complia �W iUa) (3). <br />(0) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) -Z underground primary piping will meet all of the following requirements _ <br />Primary piping in contact with hazardous substance under normal o ation conditions shall be: <br />installed inside a secondary containment system in the form of: VV secondary pipe Vault or <br />_lined trench to be sloped to a collection sump at the low point of the piping. <br />Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />Lined trench used as secondary containment <br />Material compatible with the substance stored. ` <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />(1 Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />G" / Automatic line leak detectors will be installed an pressurized piping <br />Manufacturer:Model:- 1✓1 l.t� <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />20. State hater Resources Control Board "Facility (A)" and "Tank Permit (8)" application forms submitted. <br />21. Plan review and operating permit fees paid. <br />22. What is the approximate depth to ground water:4of So 4/ - <br />(include <br />"(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />S r�QACZJtry COV6132 5 <br />23. Total number of tanks on site after installation: 3 9:7�ISTiOGI <br />24. County/City Fire District and Building Department notified. <br />25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Require,T±nts] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner ar operAat <br />r must acknowledge this responsibility for workplan submittal by signature and date below. <br />N amen .e1 • Title PR0--rEC7r /1k-'11PfGJ5:%R Date 10/0/ <br />CONDITIONS OF APt,RCVA: <br />E:1 <br />