My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_1986-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:28:27 PM
Creation date
6/23/2020 6:51:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1997
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_1986-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1- _ <br />0 -0 <br />SITE SAFETY AND HEALTH PLAN <br />(As amended September 21, 1990) <br />This Site Safety and Health Plan (SSHP) addresses the safety and health procedures that will be followed <br />during field operations for the removal and replacement of underground gasoline storage tanks at the <br />Chevron Station located at 6633 Pacific Avenue, Stockton, CA. Specifically, the SSHP addresses <br />activities pertaining to the construction, operation, and monitoring of (1) a soil vapor extraction and <br />treatment system and (2) a groundwater treatment system. <br />Soil Vapor Extraction System <br />Approximately two to three field staff will be involved in the construction activities. A sole contractor <br />will be responsible for the installation of the probes and the connection piping system. The vendor for <br />the incinerator will supervise the installation and provide start-up services for the incineration unit. This <br />work is scheduled to last approximately two to three days. <br />Tank Removal <br />Approximately four to ten field staff will be involved in the construction activities which are scheduled <br />to last approximately 45 days. <br />This SSHP is comprised of the following elements: <br />1. Key Personnel <br />2. Hazard Analysis <br />3. Personnel Protective Equipment <br />5. Environmental Monitoring Plan <br />6. Medical Surveillance Requirements <br />7. site Control Measures <br />8. Decontamination <br />9. Emergency Procedures <br />10. Documentation <br />Each of these elements are discussed in detail below. <br />1:31`i' Y� ►1�`I�l�l <br />Mr. Pat Cullen is the Project Manager (PM). Ms. Pam Bare, Certified Industrial Hygienist (CIH), is the <br />
The URL can be used to link to this page
Your browser does not support the video tag.