Laserfiche WebLink
e, <br />UST SYSTEM DRAWING INFORMATION <br />1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. Plans drawn to scale in non -erasable print. <br />3. Plot plan to show location of tanks and all associated piping. <br />4. = Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. / Tank cross-sectional diagram. <br />6. I Detail of tank, associated piping, excavation and cover. <br />7. - e Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br />Article 3, Section 2631 (b) & 26351 <br />8. - verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />9. Manufacturer's iritten installation instructions for tank(s), piping, monitoring devices, etc. <br />10. f At the installation site, prior to installation, a tightness test shall be performed on both primary (1°) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)3 <br />11. ! Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)3 <br />12_ TANY COMPOSITION <br />TANK # <br />CAPACITY <br />l® mss® ocox? lck000 <br />MANUFACTURER <br />�XI�C'lh►f� "rp fto b N <br />COMPOSITION <br />iF �GP,L. ----> <br />WALA, , <br />MODEL <br />PRODUCT <br />�'� • `? • LI • (Z •U <br />CORROSION PROTECTION <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />Y�5 <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />ZB. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />'1 ! (2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)3 <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />