Laserfiche WebLink
19. <br />20. <br />21. <br />22. <br />23. <br />24. <br />25. <br />(F) <br />Underground piping with secondary containment will be equipped and monitored as follows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />� Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: r��T� Model: STS - M L4P <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />Plan review and operating permit fees paid. _,,� <br />what is the approximate depth to ground water:4of 50' +� <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />4-7 �oaov�r., Coyi,rr�J __ F'�bl.tc. WoR�S <br />Total number of tanks on site after installation: 3 �'1�15'iI hi <br />County/City Fire District and Building Department notified. <br />In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner or ope attoo�r must acknowledge this responsibility for workplan submittal by signature and date /below. <br />N ame n✓ •� Titte PRQ�Cf� ikAAff6�T� Date %Qf 0// ) -% <br />CONDITIONS OF AP(�ROVA: <br />U <br />*ram, including Jeers). <br />Piping (cross-sectional connections to tank and <br />(A) <br />Vent and tank riser primary containment system equipped with overfill prevention system that: <br />_/ Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br />!/ <br />Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], <br />or <br />(6> <br />Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) <br />Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 <br />(a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the <br />suction is <br />released. <br />No valves or pumps installed below grade. <br />_ Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(D) <br />Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) <br />—Z Underground primary piping will meet all of the following requirements _ <br />Primary piping in contact with hazardous substance under normal op ation conditions <br />shall be: <br />installed inside a secondary containment system in the form of: VV secondary pipe <br />Vault or <br />_lined trench to be sloped to a collection sump at the low point of the piping. <br />Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />Lined trench used as secondary containment <br />Material compatible with the substance stored. ` <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) <br />Underground piping with secondary containment will be equipped and monitored as follows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />� Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: r��T� Model: STS - M L4P <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />Plan review and operating permit fees paid. _,,� <br />what is the approximate depth to ground water:4of 50' +� <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />4-7 �oaov�r., Coyi,rr�J __ F'�bl.tc. WoR�S <br />Total number of tanks on site after installation: 3 �'1�15'iI hi <br />County/City Fire District and Building Department notified. <br />In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner or ope attoo�r must acknowledge this responsibility for workplan submittal by signature and date /below. <br />N ame n✓ •� Titte PRQ�Cf� ikAAff6�T� Date %Qf 0// ) -% <br />CONDITIONS OF AP(�ROVA: <br />U <br />