Laserfiche WebLink
19. <br />20. <br />21. <br />22. <br />23. <br />24. <br />25. <br />•� Piping (cross-sectional am, including connections to tank and dis rs). <br />(A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br />_ Restricts delivery of flow to tank [Section 2635 (b) (2) (e) or (C)l, or <br />fl Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], or <br />(B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)1 <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade. <br />Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underground primary piping will meet all of the following requirement <br />Primary piping in contact with hazardous substance r normal operation conditions shall be: <br />installed inside a secondary containment system in he form of- secondary pipe®Vault or <br />_lined trench to be sloped to a collection sump t the low paint of the piping. <br />L Primary piping and secondary containment systema wilt be installed in accordance wit industry <br />code of practice and voluntary consensus standards.. <br />Lined trench used as secondary containment <br />Material compatible with the substance stored. ` <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />Automatic line leak detectors wilt be installed on pressurized piping <br />Manufacturer: Model:�e— M t.i2 <br />Annual monitoring wilt be conducted on the pressurized piping with secondary containment. <br />Annual line tightness test wilt not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />Plan review and operating permit fees paid. <br />What is the approximate depth to ground water: <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />:5Z-3; a0A h %bj Gov&sT4� Publ.tc. Wo o <br />Total number of tanks on site after installation: 3 ayysT10C, <br />County/City Fire District and Building Department notified. <br />In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requimvents] as an owner or operator to submit a workplan to PNS-EHD Site Mitigation Unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-345.0. <br />The owner,ar ops a�ttoor moist acknowledge this responsibility for workplan submittal by signature and dates below. <br />Nane.. o✓ - Title PR0-r15CL /� t,♦t�rC {� Date l®/®l! "D? <br />CONDITIONS OF APiaROVA: <br />n <br />