Laserfiche WebLink
20. <br />21. <br />22. <br />23. <br />24. <br />25. <br />10—'50— 1 yy / 1 U= ZOAM r ROM <br />e <br />Piping Ccross- sectional diagram, including connections to tank and dispensers). <br />r _ .) <br />(A) vent and tank riser primary containment system equipped with overfill prevention system that: <br />_ Restricts delivery of flow to tank [Section 2635 (b) (2) (a) or (C)], or <br />Provide positive shut off of flow to the tank at no more than 95 x [Section 2635 (b)(2)(C)I, or <br />ts) vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) J suction piping Cbetow grade piping operates at teas than atmospheric pressure) [Section 2636 (a) (3)) <br />_ Stoped to contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade_ <br />inspection method provided to demonstrate compliance with section 2636 Ca) (3). <br />(D) _Z Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(£) _Z Underground primary piping will meet att of the following requirement <br />Primary piping in contact with hazardous substance r normal ratios conditions shalt be: <br />installed inside a secondary containment system in he form of: secondary pipe Vault or <br />®lined trench to be sloped to a collection stools t the tow point of the piping. ' <br />Z_ Primary piping and secondary containment system will be installed in accord a wzt u>dustry <br />code of practice and voluntary consensus standards_. <br />Lined trench used as secondary containmenst <br />Materiat compatible with the substance stored. - <br />Covered and capable of supporting any expected vehicular traffic. <br />(f) underground piping with secondary containment will be equipped and monitored as faltows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />Automatic tine leak detectors will be installed an pressurized piping <br />manufacturer: T� Model: — Mtd2 <br />® Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual lira tightness test will not be requiredifthe continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />State Water Resources Control Board 'Facility (A)" and "Tank permit (8)p application forams submitted. <br />Plan review and operating permit fees paid. <br />What is the approximate depth to groturd water-. <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />Total number of tanks an site after installation: 3 elLtST1ts�3_ <br />County/City Fire District and Building Department notified. <br />in the event contamination is observed. Confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3. Chapter 16, Article 11, Corrective Action <br />Requirements) as an owner or ol*rator to submit a workplan to PHS -END site Mitigation unit prior to initiating any <br />assesswmnt or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner ar operator must acknowledge this responsibility for workptan submittal by signature and date below. <br />N ame,� TitlePRO;'': ' 144AAf�G�tQ Date /Qu/®//� <br />CONDITIONS OF AP; %ROVA : <br />