My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_1986-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:28:27 PM
Creation date
6/23/2020 6:51:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1997
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_1986-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. <br />21. <br />22. <br />23. <br />24. <br />25. <br />10—'50— 1 yy / 1 U= ZOAM r ROM <br />e <br />Piping Ccross- sectional diagram, including connections to tank and dispensers). <br />r _ .) <br />(A) vent and tank riser primary containment system equipped with overfill prevention system that: <br />_ Restricts delivery of flow to tank [Section 2635 (b) (2) (a) or (C)], or <br />Provide positive shut off of flow to the tank at no more than 95 x [Section 2635 (b)(2)(C)I, or <br />ts) vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) J suction piping Cbetow grade piping operates at teas than atmospheric pressure) [Section 2636 (a) (3)) <br />_ Stoped to contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade_ <br />inspection method provided to demonstrate compliance with section 2636 Ca) (3). <br />(D) _Z Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(£) _Z Underground primary piping will meet att of the following requirement <br />Primary piping in contact with hazardous substance r normal ratios conditions shalt be: <br />installed inside a secondary containment system in he form of: secondary pipe Vault or <br />®lined trench to be sloped to a collection stools t the tow point of the piping. ' <br />Z_ Primary piping and secondary containment system will be installed in accord a wzt u>dustry <br />code of practice and voluntary consensus standards_. <br />Lined trench used as secondary containmenst <br />Materiat compatible with the substance stored. - <br />Covered and capable of supporting any expected vehicular traffic. <br />(f) underground piping with secondary containment will be equipped and monitored as faltows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />Automatic tine leak detectors will be installed an pressurized piping <br />manufacturer: T� Model: — Mtd2 <br />® Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual lira tightness test will not be requiredifthe continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />State Water Resources Control Board 'Facility (A)" and "Tank permit (8)p application forams submitted. <br />Plan review and operating permit fees paid. <br />What is the approximate depth to groturd water-. <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />Total number of tanks an site after installation: 3 elLtST1ts�3_ <br />County/City Fire District and Building Department notified. <br />in the event contamination is observed. Confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3. Chapter 16, Article 11, Corrective Action <br />Requirements) as an owner or ol*rator to submit a workplan to PHS -END site Mitigation unit prior to initiating any <br />assesswmnt or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner ar operator must acknowledge this responsibility for workptan submittal by signature and date below. <br />N ame,� TitlePRO;'': ' 144AAf�G�tQ Date /Qu/®//� <br />CONDITIONS OF AP; %ROVA : <br />
The URL can be used to link to this page
Your browser does not support the video tag.