Laserfiche WebLink
10-30-1997 10_20AM FROM P-5 <br />1�,vJ,: •✓ Piping (cross-sectional diagram, including connections to tank and dispensers). <br />(A) vent and tank riser primary containment system equipped with overfill prevention system that: <br />_/ Restricts delivery of flow to tank [Section 26.35 (b) t21 (B) or (C)1, or <br />® provide positive shut off of flow to the tank at no more than 45 % (Section 2635 (b)(2)(C)3, or <br />(S) vapor recovery piping designed so it cannot contain Liquid phase product, or <br />(C) suction piping (below grade piping operates at Less than atmospheric pressure) (Section 2636 (a) (3)3 <br />_ Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released - <br />No valves or pumps installed below grade. <br />Inspection method provided to demonstrate compliance with Section 2636 (a) (3). <br />(D) Corrodible underground piping protected agoinst corrosions (Section 2636 (b)). <br />(E) _Z Underground primery piping uitl Fleet all of the following requirapent <br />Primary piping in contact with hazardous tonne r normal o ration conditions shalt be: <br />installed imide a secondary containment system in he form of: secondary pipe Vault or <br />_Lined trench to be sloped to a collection t the low point of the piping. / <br />Primary piping and secondary containment systems will be installed in accordance w,t Industry <br />code of practice and voluntary consensus standards_. <br />Lined trench used as secondary containment <br />® Material compatible with the substance stored. <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />Automatic line leak detectors will be insta(Led on pressurized piping <br />Manufacturer: Model: -5;rP— Mtda <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual tine tightness test will rot he required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />faits or is disconnected. <br />20. State Water Resources Control Board "facility (A)m and "Tank Permit (8)16 application form submitted. <br />29. Plan review and operating permit fees paid. <br />22. What is the approximate depth to ground water: <br />(include source of information - borehole logs, monitoring well darn, water <br />studies, etc,) <br />23. / Total number of tanks on site after installation: 3�1csT1 NST <br />24. ®' County/City Fire District and Building Department notified. <br />25. `/ in the event contamination is observed, confirmed or suspected as a result of a Leaking UST System it is your <br />responsibility Ein accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Require,�nts3 as an owner or opirator to submit a workplan to PHS-EHO site Mitigation Unit prior to initiating any <br />assessment or remediation activities. for further assistance contact the Site Mitigation Unit at (204) 464-3450. <br />The owntr,'r ape ator must acknowledge this responsibility for workplan submittal by signature and date beta+_ <br />N ane.. 1Jto-_bVVteZr Title Pryil2g %1kAPk4C%,F_Date IQ�Cif%� <br />COND I T I ONS of APt ngovp : <br />