My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:43:47 PM
Creation date
6/23/2020 6:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l s <br /> •r <br /> GENERAL INSTRUCTIONS <br /> Overfilled Tank: Failure of the hose to drain after <br /> The OPW 71 SO Overfill Prevention Valve is closing the delivery valve signals an overfilled tank. <br /> designed for tight fill, gravity drop applications to Do Not Disconnect any delivery hose fitting until the <br /> help prevent accidental or intentional overfilling of liquid level in the tank has been lowered to allow the <br /> underground storage tanks. It is installed in the UST hose to drain into the tank. <br /> drop tube in place of a standard drop tube. <br /> The main 71 SO valve closes when liquid level is at WARNING <br /> 95%of the top of the tank. A small bypass valve In the event you are splashed with fuel remove wet <br /> remains open to allow the delivery hose to drain at clothing immediately. Skin contact with gasoline can <br /> 3-5 gallons per minute. If the delivery truck valve is cause chemical bums and may result in inhalation of <br /> not closed after initial shut-off,the bypass valve will vapors that may be fatal. Never go inside confined <br /> close and will restrict all fuel delivery. areas after being splashed and never go near <br /> ignition sources. <br /> The 71 SO models of the 71 SO are designed to be <br /> installed with the following OPW products: Face Seal IMPORTANT <br /> Adaptor, OPW Spill Container or Multi-port,Jack Determine if the underground storage tank is <br /> Screw Kit, Rotatable Product Adaptor, and Product equipped with a ball float vent valve,as <br /> Cap. illustrated in Figure 24. In all systems,the shut- <br /> off point of the 71 SO must be reached before the <br /> IMPORTANT ball float reduces flow to ensure proper overfill <br /> Read these assembly and installation instructions valve operation. <br /> completely and carefully prior to starting. Check to <br /> make sure all parts have been provided. Use only <br /> the parts supplied; substitution of parts may cause TOOLS NEEDED FOR INSTALLATION AND <br /> product failure. ASSEMBLY: <br /> 1. 71 SO-TOOL(includes the following) <br /> Failure to follow instructions may cause improper a. Sharp 3/16"drill bit with stop <br /> product operation or premature failure which may b. Punch <br /> permit storage tank overfill. An overfilled storage 2. Drill <br /> tank may create hazardous conditions and/or 3. Hammer <br /> environmental contamination. 4. Tape measure <br /> 5. Hacksaw or cut-off saw,fine tooth;24 teeth/inch <br /> CAUTION 6. Fine half round file <br /> Do not remove elastic band from around float until 7. Screwdriver-Phillips blade <br /> instructed to do so, as damage to valve may result. 8. Fine grit sandpaper/steel wool <br /> 9. Grease,black moly <br /> WARNING 10. Torque Wrench <br /> Failure to properly connect delivery hose and elbow, 11. Band clamp(3-3/4"diameter minimum) <br /> and/or disconnecting a liquid filled delivery hose or <br /> elbow will result in a hazardous spill,which may WARNING <br /> result in personal injury, property damage,fire, Using electrically operated equipment near gasoline <br /> explosion, and water and soil pollution. or gasoline vapors may result in fire or explosion, <br /> • Make sure all connections, including the hose causing personal injury and property damage. <br /> and elbow connections, between storage tank Check to assure the working area is free from such <br /> and transport are securely coupled. hazards, and always use proper precautions. <br /> • Make sure the lip seal and/or all gaskets in the <br /> delivery elbow are properly in place to prevent <br /> spills. <br /> • Do not operate with damaged or missing parts, IMPORTANT:The figures in this installation and <br /> which prevent tight connections. maintenance instruction may contain vapor recovery <br /> equipment(including model numbers)that is not <br /> certified by the California Air Resources Board <br /> Normal Operation:A Hose"Kick"and reduced flow (GARB)for a specific Phase I Vapor Recovery <br /> signal that the tank is full. Close transport delivery System. Please refer to Exhibit 1 of the appropriate <br /> valve and drain hose into tank before disconnecting CARB Phase I Executive Order for a list of certified <br /> any hose fitting. Phase I Vapor Recovery System Equipment. <br /> bPW 71 SO Overfill Prevention Valve Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.