My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:43:47 PM
Creation date
6/23/2020 6:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ASSEMBLY INSTRUCTIONS <br /> Measuring Stick <br /> IMPORTANT: Each of the numbered steps in the <br /> installation instructions are designed as a CHECK <br /> LIST to ensure proper installation and trouble free <br /> operation of the OPW 71 SO Overfill Prevention <br /> Valve. <br /> Read and follow these steps carefully, checking Riser Pipe <br /> them off as you proceed. with Face (A) <br /> Seal Adaptor To Tank <br /> Figure numbers correspond to step numbers for Top(I.D.) (B) <br /> easy reference. Bottom <br /> STEP 1: MEASURE <br /> Install the OPW Face Seal Adaptor and the OPW 6-1/2" <br /> Thread-on Spill Container on the Fill Riser(Refer to <br /> the Installation Instructions Supplied with the Spill <br /> Container). Insert the 71 SO measuring stick Figure 1 <br /> through the riser pipe and hook it under the inside of <br /> the tank in the lengthwise direction. Mark the <br /> measuring stick at the top of the Face Seal Adaptor <br /> threads inside the base of the spill container bucket <br /> just below the drain valve outlet window(See Figure <br /> 1 W A). The top flange on the 71 SO will rest on the 4" <br /> NPT <br /> Face Seal Adaptor just below the drain valve outlet, Nipple <br /> and be locked in place between the Face Seal <br /> Adaptor and the 4"nipple that is installed in the spill <br /> container with the Jack Screw Kit(See Figure 1A). <br /> (For riser pipe configurations other than that shown, <br /> consult installation drawings or use other necessary o <br /> means to measure Dimension"A"). OPW Spill <br /> Container <br /> Using a tape measure, measure the distance from Jack Screw <br /> the top of the Face Seal Adaptor in the spill Mark measuring Kit <br /> container to the bottom of the tank(Dim."B"). stick here for <br /> Jack Screw ® O-Ring Seal <br /> IMPORTANT: Inspect the riser pipe for any foreign installation <br /> material. Over spray from tank relining or any (Top of Face Face Seal <br /> internal burrs inside of pipe must be removed prior Seal Adaptor) 71SO Adaptor <br /> to installation. Failure to have an unobstructed riser <br /> pipe may prevent proper installation and operation of Figure 1A <br /> the valve. The 71 SO is designed for installation into <br /> schedule 40 riser pipes. The 71 SO cannot be <br /> installed into schedule 80 riser pipes. <br /> STEP 2: MARK THE TUBE Measuring Stick <br /> Use the result from STEP 1 and HOW TO LOCATE <br /> THE POSITION OF THE 71 SO AT 95%TANK <br /> CAPACITY to mark the upper tube. Measure the <br /> distance from the seam where the upper tube and <br /> valve body meet. For"C"measurements less than Transfer Mark <br /> or equal to 6-1/2"see Figure 2. For"C° From Stick to <br /> measurements greater than 6-1/2"use a tape Upper Tube <br /> measure to mark the calculated upper tube length (Cut Line) <br /> onto the upper tube. Seam <br /> Figure 2 (For"C"less than or equal to 6-1/2"only) <br /> OPW 71 SO Overfill Prevention Valve Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.