My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:43:47 PM
Creation date
6/23/2020 6:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 6: APPLY GREASE TO DROP TUBE STEP 8: INSTALL INLET TUBE <br /> Apply black moly grease to the inside diameter of Insert the inlet tube into the upper tube until the <br /> the upper drop tube. Make sure coverage is upper tube seats against the flange on the inlet tube. <br /> completely around the tube as shown in Figure 6. Ensure polypak is inserted evenly and stays in inlet <br /> tube groove. <br /> Figure 6 <br /> Figure 8 <br /> STEP 7: APPLY GREASE TO POLYPAK SEAL STEP 9: INSERT 71SO-TOOL OVER INLET TUBE <br /> Ensure that the polypak seal is installed on the inlet To install the 71 SO-TOOL(sold separately)over the <br /> tube with the lip up as shown in Figure 7. Apply inlet tube,first loosen all three knobs so the tool can <br /> black moly grease to the polypak as shown. Make pass freely over the inlet tube flange. Align the slot <br /> sure coverage is completely around the polypak on the tool with the key on the inlet tube and insert <br /> seal. the tool down. See Figure 9. <br /> Tool slot Loosen all Hand <br /> Ensure polypak knobs View holes tighten <br /> lip is up knobs <br /> —--- evenly <br /> Inlet <br /> Tube %� Polypak <br /> Inlet <br /> Tube <br /> key <br /> Apply grease <br /> around polypak <br /> Figure 7 <br /> Figure 9 Figure 10 <br /> STEP 10: TIGHTEN THE 71SO-TOOL <br /> Use the three view holes to ensure that the tool <br /> seats out flat against the top of the inlet tube. To <br /> prevent vertical movement of the tool during drilling <br /> hand tighten all three knobs evenly tight against the <br /> upper drop tube. See Figure 10. <br /> OPW 71 SO Overfill Prevention Valve Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.