My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:49:58 PM
Creation date
6/23/2020 6:52:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--3_- <br /> configuration, either TP-201.1 D, Leak Rate of Drop Tube Overfill Prevention Device and Spill <br /> Container Drain Valve(October 8, 2003); or TP-201.1 C, Leak Rate of Drop Tube/Drain Valve <br /> Assembly(October 8, 2003). Shorter time periods may be specified in accordance with local <br /> district requirements. Notification of testing, and submittal of test results, shall be done in <br /> accordance with local district requirements and pursuant to the policies established by that district.' ? <br /> Local districts may require thq use of alternate test form(s), provided they include the same <br /> minimum parameters Identified in the datasheet referenced in the test procedure(s). Alternative <br /> test procedures, including the most recent versions of the test procedures listed above, may be <br /> used if determined by the Executive Officer or Executive Officer delegate, in writing, to yield <br /> comparable results. Testing the Pressure/Vacuum(PN)Vent valve will be at the option of the <br /> local districts. If PN valve testing is required by the district,the test shall be conducted in <br /> i accordance with TP-201.1 E, Leak Rate and.Cracking Pressure of PressureNacuum Vent <br /> Valves(October 8, 2003)and Exhibit 2. <br /> IT IS FURTHER ORDERED that the Phil-Tito system shall be compatible with gasoline in common <br /> use in California at the time of certification, including E-85(85%ethanol/15%gasoline)for specific <br /> components listed in Exhibit 1. Any-modifications to comply with future California gasoline <br /> requirements shall be approved in writing by the Executive Officer or Executive Officer delegate. <br /> IT IS FURTHER ORDERED that GDF installations permitted under VR-101-K for E-85 fuel that.use <br /> the PV-Zero-E85 Pressure/Vacuum Vent Valve shall be subject to a throughput limitation of 1.2 <br /> million gallons per year(100,000 gallons per month). <br /> IT IS FURTHER ORDERED that the certification of the Phil-Tito Phase I Vapor Recovery System Is <br /> valid through May 31, 2013 to provide more time for the Executive Officer or Executive Officer <br /> delegate to gather necessary information to complete a_renewal evaluation. <br /> IT IS FURTHER ORDERED that Executive Order VR-101-L issued on September 1, 2009, is <br /> hereby superseded by this Executive Order. Phil-Tice Phase I Vapor Recovery Systems certified <br /> under Executive Orders VR-*101-A to L may remain in use at existing installations. This Executive <br /> Order shall apply to new installations or major modification of the Phase I system of existing <br /> gasoline dispensing facilities. <br /> Executed at Sacramento, California, this, day of May, 2012: <br /> Alberto Ayala, h.D , M. . <br /> Chief, Monitoring d Laboratory Division <br /> Attachments: <br /> Exhibit 1 Phil-Tits Phase I Vapor Recovery System Equipment List <br /> Exhibit 2Installation, Maintenance and Compliance Specifications <br /> Exhibit 3Manufacturing Performance Standards and Specifications <br /> Executive Order VR-101-M, Phil-Tito Phase l Vapor Recovery System <br />
The URL can be used to link to this page
Your browser does not support the video tag.