My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:49:58 PM
Creation date
6/23/2020 6:52:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 (continued) <br /> Phil-rite Phase I Vapor Recovery System Equipment List <br /> Equipment Manufacturer/Model Number <br /> Tank Gauge Port Com ponents EBW 90037-E (in Tank Probe Cap and Adapter Ki t)(Gas/E85) <br /> (Continued) <br /> Morrison Brothers 305-0200AAEVR(replacement adaptor) <br /> (Gas/E85) <br /> Morrison Brothers 305XP-110ACEVR (replacement cap) <br /> (Gas/E85) <br /> EBW 90037(In Tank Probe Cap and Adaptor Kit) (Gas) <br /> Drop Tube Overfill Prevention Device' <br /> Phil-Tite 61SO-PT(Gas) <br /> EBW 708-49X-1Y (Gas) <br /> EBW 708-49X-3Y(Gas/E85) <br /> X represented by: <br /> 1 = 5 foot length upper drop tube section <br /> 2= 10 foot length upper drop tub a section <br /> Y represented by: <br /> 1 = 8 foot length bottom thread-on section drop tube <br /> 2= 10 foot length bottom thread-on section drop tube <br /> Drop Tube' OPW 61-T (various lengths) (Gas) <br /> EBW 782-204-3X2 (Gas/E85) (Note: 4 inch diam eter tube) <br /> X represented by: <br /> 0= 10 feet <br /> 2= 12 feet <br /> Riser Offset' Phil-Tito M-6050 (Gas/E85) <br /> ' If these components are installed or required by regulations of other agencies, only those components and <br /> model numbers specified above shall be installed or used. <br /> Executive Order VRA 01-M, FFS Phil-rite Phase I Vapor Recovery System, Exhibit 1, Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.