My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:54:13 PM
Creation date
6/23/2020 6:52:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> I <br /> (TYPE) AUTO LIMITER II Overfill Valve In Tank Shut Off Level Worksheet <br /> I Important: This is meant to be a supplemental worksheet and not a substitute to following the installation . <br /> :manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdiction <br /> i'(AHJ) and review local,state, and national codes to determine the regulatory requirements governing shu#=off; <br /> capacity in your region, as well as take into account other considerations such as extreme tank tilt a i <br /> Take the following measurements with the valve <br /> f Installed in the tank: <br /> 'Upper tube to shut off paint on valve. <br /> (D)= 481/4 l <br /> IV <br /> (w) <br /> = 130 3/4 BECE <br /> I (U)= 127 5/8oC.j , 4IL <br /> 2018 <br /> Top of tube flange to tank bottom. <br /> ENTAL HEALTH <br /> ENVIRONM <br /> (B) = 133OEPARTMEW <br /> (D) <br /> ,'From the tank calibration chart provided by tank upper <br /> manufacturer find the dipstick number(Y)which Tube <br /> corresponds to the 100%volume. J <br /> (Y)= 9.842 <br /> l+� <br /> i1. To determine shut-off percentage: valve, <br /> :Subtract upper tube length (D)from distance to Length, <br /> tank bottom B <br /> bottom of , <br /> ( ) <br /> n tl <br /> I (X)_(B)—(D)-2"_ (OPW) <br /> (B) <br /> To Tank <br /> I(X)_(B)—(D) = 84.75 (Other) <br /> #s <br /> Using the tank calibration chart provided by the .t a <br /> tank manufacturer determine the tank capacity at <br /> the calculated (X)dimension and the 100%volume ane (Y) <br /> ;[,(Y)tank capacity- Length, Tank <br /> . Chart <br /> top of cut 100% <br /> fiX)tank capacity in gallons= 9.305 volume <br /> Dipstick � { <br /> (Y)tank capacity in gallons= 9.842 i <br /> i <br /> SO%=(X)capacity/(Y)capacity x 100= 94.5% <br /> NV <br /> FACILITY: (TANK 2'- REGULAR 1 - NORTH) <br /> CHEVRON <br /> ;6833 PACIFIC AVENUE <br /> STOCKTON, CA 95207 Note:The overfill valve must be installed per AHJ <br /> requirements and all applicable local, state, and national <br /> codes. If overfill valve is set above the allowable shut-Oft,, 1 <br /> NOTES: Valve was removed and functional. percentage the overfill valve must be removed and <br /> replaced. For reference 40 CFR part 280 Subpart B Section <br /> 280.20 overfill valves should be set to a maximum of 95%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.