My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:54:13 PM
Creation date
6/23/2020 6:52:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO[3 <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> To break out existing fill cover manways, replace with Phil-Tite Multiport Manways to match existing Phil-Tite spill <br /> buckets. This will allow spill buckets to now hold minimum of 5 gallon amount as required. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Phil-Tite: (3) M42-2C-0-1-NPR Multiport <br /> (3)85100-1 Fill Buckets(replacing like for like with new) <br /> (3)85101-1 Vapor Buckets (replacing like for like with new) <br /> Franklin: (6)WTRB-1013 Reducer Boots <br /> Western Fiberglass: (3)TAL-MTP-CU Multiport Lids <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.