Laserfiche WebLink
0 0 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO[3 <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> To break out existing fill cover manways, replace with Phil-Tite Multiport Manways to match existing Phil-Tite spill <br /> buckets. This will allow spill buckets to now hold minimum of 5 gallon amount as required. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Phil-Tite: (3) M42-2C-0-1-NPR Multiport <br /> (3)85100-1 Fill Buckets(replacing like for like with new) <br /> (3)85101-1 Vapor Buckets (replacing like for like with new) <br /> Franklin: (6)WTRB-1013 Reducer Boots <br /> Western Fiberglass: (3)TAL-MTP-CU Multiport Lids <br /> 3 <br />