Laserfiche WebLink
San Joaquin County <br />Environmental Health Department <br />r ---v % 1868 East Hazelton Avenue <br />Stockton, California 95205-6232 <br />November 14, 2016 <br />Mr. Mark Vendeiro <br />MVP Petroleum Engineering <br />P.O. Box 281 <br />Folsom, CA 95763 <br />Re: Pacific Avenue Chevron <br />6633 Pacific Avenue <br />Stockton, CA 95207 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />FILE Curr <br />DIRECTOR <br />Linda Turkatte, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Adrienne Ellsaesser, REHS <br />Rodney Estrada, REHS <br />Willy Ng, REHS <br />1 <br />rn��e <br />DO I ; <br />0 <br />G Ie0(ti i���Z <br />SR0076181 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to replace three existing dispensers with B12/3 Wayne Ovation <br />dispensers (3+0) and three existing dispensers with B23/4 Wayne Ovation dispensers (3+1); <br />install six CONV-B2000-OPP Bravo UDC conversion frames; change the 89 -product <br />underground storage tank (UST) to 91 -product UST and change the 91 -product UST to diesel - <br />product UST on the UST system at the above noted address. (Note that the cold start <br />associated with the installation of the ISD software does not require a permit.) The permit has <br />been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Vicki McCartney at (209) 468-9852 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Verification that potential dispenser piping leaks drain into the under dispenser <br />containments. <br />b. Verification that the vapor recovery piping in the converted diesel fill sump will be <br />plugged at the tank entry fitting with a black iron plug. <br />c. Verification that the vapor recovery piping entering the diesel fill sump will be capped <br />with a black iron cap. <br />4. Any individual performing the work of a service technician must meet the following <br />qualifications: <br />a. Possess or be employed by a person who possesses one of several permissible <br />valid, current contractor's licenses issued by the Contractors State License Board <br />